24523
Comment:
|
25874
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
== Today's work plan: 2019/10/15 1PM - 2019/10/16 1PM == | == Today's work plan: 2019/11/11 1PM - 2019/11/12 1PM == |
Line 13: | Line 13: |
* Noise budget for Type A DARM using green lock for both arm (Lucia) * DAQ restart (Takano) * Coil balancing (Fujii) * BS TF measurement for ASC (Fabian) * TMS TF maesuremt using single arm (Tanaka) * Investigate the REFL PD coupling into the ALS error signals. (Nakano, Takano) |
* Fix green instability (Nakano, Yamamoto) * ASC test with X arm (Eleonora, Lucia, K.Tanaka) * FPMI lock trial (Nakano, Yamamoto) * ISS measurement in mine (Yoshioka) * |
Line 22: | Line 20: |
* Recover FPMI lock (Nakano, Ushiba, Takano) * TMS TF maesuremt using single arm (Tanaka) * Taking all SDF snapshots (Yamamoto) === Oct. 16 Morning === * ASC with simple MICH (Kokeyama) * ETM TF measurement for ASC (Lucia) * Move OSTM in the afternoon (Takahashi, Sato) ||Configuration||silent-run slot ||day-time || || || || || ||X-arm ||K.Tanaka for 2hr|| || ||Y-arm || || || ||MICH ||Yokozawa for 1hr|| || ||ALS-DARM || || || ||FPMI || || || || || || || ||BS || ||Fabian for morning|| ||ITMX || ||Lucial for morning|| ||ETMX || ||Lucial for morning|| ==== Comments (from YF, please feel free to rm this comments after reading:) ==== * Why not have a table/spreadsheet like the following somewhere as Yokozawa-san suggested? We definitly need much more fancy one and user-friendly one though. I could not find any other good idea now sorry. '''Could someone please work on it?''' The number of the people who want to use the interferometer is NOT one or two anymore. * mainly for day-time work and silent-run * maybe for requesting, or for showing the planned/allowed ones. * with proposer name and rough estimation of the necessary time slot (duration)? || Configuration || silent-run slot || day-time || || X-arm || YF for 2hr || || || || KT for 2hr || || || Y-arm || || || || MICH || || || || ALS-DARM || || || || FPMI || || || || ... || || || |
* Fix green instability (Nakano, Yamamoto) * FPMI lock trial (Nakano, Yamamoto) === Weekend === === Nov. 12 Morning === * Preparation for OMC work (Aso) * ISS Guardian test (Yoshioka, Miyakawa) * ISS measurement (Yoshioka) * Changing valve unit for IXC (Tomaru) * Preparation for OMC work (Aso) ||Configuration||11/11 silent-run slot||Morning ||11/8 Afternoon ||Evening ||Weekend || || || ||Maintenance || || || || ||PSL || || ||ASC ~3pm || || || ||IMC || || ||ASC ~3pm || ||Nakano || ||X-arm || || || || || || ||Y-arm || || || || || || ||MICH || || || || || || ||ALS-DARM || || || || || || ||FPMI || || ||LSC 3pm~ ||LSC ||LSC || ||PFPMI || || || || || || || || || || || || || ||BS || || || || || || ||ITMX || || || || || || ||ITMY || || || || || || ||ETMX || || ||Pcal || || || ||ETMY || || || || || || ||PRM || || || || || || ||PR2 || || || || || || ||SRM || || || || || || ||REFL port || || || || || || ||AS port || || || || || || |
Line 138: | Line 131: |
* Vacuum pump noise measurement (Yokozawa) * Temperature stabilization due to fan off (Miyoki) |
KAGRA Commissioning Wiki
Contents
Today's work plan: 2019/11/11 1PM - 2019/11/12 1PM
Afternoon
- Fix green instability (Nakano, Yamamoto)
- ASC test with X arm (Eleonora, Lucia, K.Tanaka)
- FPMI lock trial (Nakano, Yamamoto)
- ISS measurement in mine (Yoshioka)
Evening
- Fix green instability (Nakano, Yamamoto)
- FPMI lock trial (Nakano, Yamamoto)
Weekend
Nov. 12 Morning
- Preparation for OMC work (Aso)
- ISS Guardian test (Yoshioka, Miyakawa)
- ISS measurement (Yoshioka)
- Changing valve unit for IXC (Tomaru)
- Preparation for OMC work (Aso)
Configuration |
11/11 silent-run slot |
Morning |
11/8 Afternoon |
Evening |
Weekend |
|
|
Maintenance |
|
|
|
PSL |
|
|
ASC ~3pm |
|
|
IMC |
|
|
ASC ~3pm |
|
Nakano |
X-arm |
|
|
|
|
|
Y-arm |
|
|
|
|
|
MICH |
|
|
|
|
|
ALS-DARM |
|
|
|
|
|
FPMI |
|
|
LSC 3pm~ |
LSC |
LSC |
PFPMI |
|
|
|
|
|
|
|
|
|
|
|
BS |
|
|
|
|
|
ITMX |
|
|
|
|
|
ITMY |
|
|
|
|
|
ETMX |
|
|
Pcal |
|
|
ETMY |
|
|
|
|
|
PRM |
|
|
|
|
|
PR2 |
|
|
|
|
|
SRM |
|
|
|
|
|
REFL port |
|
|
|
|
|
AS port |
|
|
|
|
|
Meetings
Zoom 1 URL: https://zoom.us/j/7631499341
- Time: 4PM, everyday
- Location: KAGRA control room
Zoom 1 URL: https://zoom.us/j/7631499341
- Time: 9AM, everyday
- Location: KAGRA control room
Zoom 2 URL: https://zoom.us/j/6676627462
- Time: 11AM, every Tuesday
- Location: 2F large meeting room
Working people assignment
Schedule
- Cryo cooler check on 8/5 (Kimura)
- ITMX cooler stop on 8/6 (CRY)
- Y arm will be available from 8/8~
- ETMX warm up 8/9 (CRY)
- ETYY cooling (CRY)
Standing issues
- PEM - measured data sharing (Washimi, Yokozawa)
- How to control the PSL temperature when people enters the room (Miyoki)
- DRMI lock stability
- 3f transition
- Search for better Gouy phase in PRC
- PRFRMI: with stable 3f signals and ALS extra range, FPPRMI may fix the glitches?
- VIS related
- Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
- United Guardian for all 4 suspensions (Okutomi)
- Damping
- Type A: Feed forward technic to suppress extra motion (Nakano)
- Automation script for damping for calm down phase
PR2 & PRM oplev wind shield, PR3 LS oplev centering
- Wind shield for PR2 and PRM (Enomoto)
- For ASC things
- Fix clipping at IFI with IFO (Kokeyama)
- Measure TF of VIS as ASC actuator (Okutomi)
- One arm WFS test
- ETMY strong damping (Lucia, Ushiba)
DAC non-linearity (http://klog.icrr.u-tokyo.ac.jp/osl/?r=10699)
- QPD diagonalization ETMX and ETMY, for remote work (Akutsu)
- Establishing investigation method for diagonalization using ETMY only (all VIS power)
- Fix oplev noise for ITMY
- Fix oplev noise for ITMX
- Fix oplev gain for ETMY (Akutsu)
- Covering wind shield for oplevs of iMC (Akutsu, or somebody)
- Investigation for noise of length oplev noise for ITMs (VIS + CRY)
- PD dark noise investigation (Kozakai)
- Sensor correction for Type B by large motion like typhoon (Fabian)
- Check for all PD or other circuits for grounding on table (Ushiba)
- Gate valve test (Tomaru)
- Vacuum pump noise measurement (Yokozawa)
- Temperature stabilization due to fan off (Miyoki)
KAGRA/Commissioning/DailyWork << < 2024 / 11 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 |
Weekly meeting
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
82 |
2019/10/15 |
See agenda page |
|
||
81 |
2019/10/8 |
See agenda page |
|
||
80 |
2019/10/1 |
See agenda page |
|||
79 |
2019/9/3 |
See agenda page |
|
||
78 |
2019/8/20 |
See agenda page |
|||
77 |
2019/8/6 |
See agenda page |
|||
76 |
2019/7/23 |
See agenda page |
|||
75 |
2019/7/16 |
See agenda page |
|||
74 |
2019/7/2 |
See agenda page |
|||
73 |
2019/6/25 |
See agenda page |
|||
72 |
2019/5/28 |
See agenda page |
|||
71 |
2019/5/21 |
See agenda page |
|||
70 |
2019/5/14 |
See agenda page |
|||
69 |
2019/5/7 |
See agenda page |
|||
68 |
2019/4/23 |
See agenda page |
|||
67 |
2019/4/16 |
See agenda page |
|||
66 |
2019/4/9 |
See agenda page |
|||
65-1 |
2019/4/2 |
|
|
|
|
65 |
2019/4/2 |
See agenda page |
|||
64 |
2019/3/26 |
See agenda page |
|||
63 |
2019/3/11 |
See agenda page |
|
||
62 |
2019/3/5 |
See agenda page |
|
||
61 |
2019/2/19 |
See agenda page |
|
||
60 |
2019/2/5 |
See agenda page |
|
||
59 |
2019/1/29 |
|
|
||
58 |
2019/1/22 |
|
|
||
57 |
2019/1/8 |
|
|
||
56 |
2018/12/25 |
|
|
||
55 |
2018/12/17 |
|
|
||
54 |
2018/12/11 |
|
|
||
53 |
2018/12/4 |
|
|
||
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)
Task list
Documents
Communication tools
- wiki
Task assignment list ([[https://docs.google.com/spreadsheets/d/1qipguowxaEbEEV9LYxvHR_aMBxn0Evsl