== Today's work plan: 2019/10/15 1PM - 2019/10/16 1PM == == Today's work plan: 2019/10/29 1PM - 2019/10/30 1PM ==
Line 13: Line 13:
 * Noise budget for Type A DARM using green lock for both arm (Lucia)
 * DAQ restart (Takano)
 * Coil balancing (Fujii)
 * BS TF measurement for ASC (Fabian)
 * TMS TF maesuremt using single arm (Tanaka)

 * Investigate the REFL PD coupling into the ALS error signals. (Nakano, Takano)
 * Replacing PDA1 on RELF table (Takano, Ushiba)
 * FPMI lock (Takano, Aso)
  * Investigation for noise injection from REFL PD.
 * ISS work outside of PSL room (Yoshioka)
 * Checking fan on/off test at SR booth in short time (Washimi)
 * Measurement of magnetic field of 18V power supply for circulator (Yokozawa, TN.Tanaka)
Line 22: Line 22:

 * Recover FPMI lock (Nakano, Ushiba, Takano)
 * TMS TF maesuremt using single arm (Tanaka)
 * Taking all SDF snapshots (Yamamoto)


=== Oct. 16 Morning ===
 * ASC with simple MICH (Kokeyama)
 * ETM TF measurement for ASC (Lucia)
 * Move OSTM in the afternoon (Takahashi, Sato)

||Configuration||silent-run slot ||Morning ||Afternoon ||Evening||
|| || || || || ||
||X-arm ||K.Tanaka for 2hr|| || || ||
||Y-arm || || || || ||
||MICH ||Yokozawa for 1hr|| || || ||
||ALS-DARM || || || || ||
||FPMI || || || || ||
|| || || || || ||
||BS || ||Fabian || || ||
||ITMX || ||Lucia || || ||
||ETMX || ||Lucia || || ||
||SRM || ||Fabian fixs guardian|| || ||
||AS port || || ||Takahashi for OSTM|| ||

==== Comments (from YF, please feel free to rm this comments after reading:) ====

 * Why not have a table/spreadsheet like the following somewhere as Yokozawa-san suggested? We definitly need much more fancy one and user-friendly one though. I could not find any other good idea now sorry. '''Could someone please work on it?''' The number of the people who want to use the interferometer is NOT one or two anymore.
   * mainly for day-time work and silent-run
   * maybe for requesting, or for showing the planned/allowed ones.
   * with proposer name and rough estimation of the necessary time slot (duration)?
|| Configuration || silent-run slot || day-time ||
|| X-arm || YF for 2hr || ||
|| || KT for 2hr || ||
|| Y-arm || || ||
|| MICH || || ||
|| ALS-DARM || || ||
|| FPMI || || ||
|| ... || || ||
 * FPMI lock (Takano, Aso)
 * Measurement for VIS (Fujii)
 * Measurement for actuator efficiency for ITM, ETMY (Yamamoto)

=== Oct. 29 Morning ===
 * Measurement among some sensors using IFO (Yokozawa)
 * ISS work outside of PSL room (Yoshioka)
 * FPMI lock (Takano, Aso)


||Configuration||10/29 silent-run slot||Morning ||10/28 Afternoon ||Evening ||Weekend ||
|| || || || || || ||
||PSL || ||Yoshioka ||Yoshioka || || ||
||X-arm || || || || || ||
||Y-arm || || || || || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI || ||Takano ||Takano ||Takano ||Takano ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || || || ||
||ITMY || || || || || ||
||ETMX || || || || || ||
||ETMY || || || || || ||
||PRM || || || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || || || || ||
||AS port || || || || || ||
Line 138: Line 129:

 * Vacuum pump noise measurement (Yokozawa)

 * Temperature stabilization due to fan off (Miyoki)

KAGRA Commissioning Wiki


Meeting archive

Today's work plan: 2019/10/29 1PM - 2019/10/30 1PM

Afternoon

  • Replacing PDA1 on RELF table (Takano, Ushiba)
  • FPMI lock (Takano, Aso)
    • Investigation for noise injection from REFL PD.
  • ISS work outside of PSL room (Yoshioka)
  • Checking fan on/off test at SR booth in short time (Washimi)
  • Measurement of magnetic field of 18V power supply for circulator (Yokozawa, TN.Tanaka)

Evening

  • FPMI lock (Takano, Aso)
  • Measurement for VIS (Fujii)
  • Measurement for actuator efficiency for ITM, ETMY (Yamamoto)

Oct. 29 Morning

  • Measurement among some sensors using IFO (Yokozawa)
  • ISS work outside of PSL room (Yoshioka)
  • FPMI lock (Takano, Aso)

Configuration

10/29 silent-run slot

Morning

10/28 Afternoon

Evening

Weekend

PSL

Yoshioka

Yoshioka

X-arm

Y-arm

MICH

ALS-DARM

FPMI

Takano

Takano

Takano

Takano

PFPMI

BS

ITMX

ITMY

ETMX

ETMY

PRM

PR2

SRM

REFL port

AS port


Meetings


Working people assignment

Schedule

  • Cryo cooler check on 8/5 (Kimura)
  • ITMX cooler stop on 8/6 (CRY)
  • Y arm will be available from 8/8~
  • ETMX warm up 8/9 (CRY)
  • ETYY cooling (CRY)


Standing issues

VIS Task List

  • PEM - measured data sharing (Washimi, Yokozawa)
  • How to control the PSL temperature when people enters the room (Miyoki)
  • DRMI lock stability
    • 3f transition
    • Search for better Gouy phase in PRC
  • PRFRMI: with stable 3f signals and ALS extra range, FPPRMI may fix the glitches?
  • VIS related
    • Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
    • United Guardian for all 4 suspensions (Okutomi)
    • Damping
    • Type A: Feed forward technic to suppress extra motion (Nakano)
    • Automation script for damping for calm down phase
    • PR2 & PRM oplev wind shield, PR3 LS oplev centering

    • Wind shield for PR2 and PRM (Enomoto)
  • For ASC things
    • Fix clipping at IFI with IFO (Kokeyama)
    • Measure TF of VIS as ASC actuator (Okutomi)
    • One arm WFS test
  • ETMY strong damping (Lucia, Ushiba)
  • DAC non-linearity (http://klog.icrr.u-tokyo.ac.jp/osl/?r=10699)

  • QPD diagonalization ETMX and ETMY, for remote work (Akutsu)
  • Establishing investigation method for diagonalization using ETMY only (all VIS power)
  • Fix oplev noise for ITMY
  • Fix oplev noise for ITMX
  • Fix oplev gain for ETMY (Akutsu)
  • Covering wind shield for oplevs of iMC (Akutsu, or somebody)
  • Investigation for noise of length oplev noise for ITMs (VIS + CRY)
  • PD dark noise investigation (Kozakai)
  • Sensor correction for Type B by large motion like typhoon (Fabian)
  • Check for all PD or other circuits for grounding on table (Ushiba)
  • Gate valve test (Tomaru)
  • Vacuum pump noise measurement (Yokozawa)
  • Temperature stabilization due to fan off (Miyoki)


KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  



Weekly meeting

No.

Date

Agenda

Schedule

Minute

Files

82

2019/10/15

Agenda

See agenda page

Minute

81

2019/10/8

Agenda

See agenda page

Minute

80

2019/10/1

Agenda

See agenda page

Minute

file

79

2019/9/3

Agenda

See agenda page

Minute

78

2019/8/20

Agenda

See agenda page

Minute

File

77

2019/8/6

Agenda

See agenda page

Minute

76

2019/7/23

Agenda

See agenda page

Minute

75

2019/7/16

Agenda

See agenda page

Minute

74

2019/7/2

Agenda

See agenda page

Minute

73

2019/6/25

Agenda

See agenda page

Minute

72

2019/5/28

Agenda

See agenda page

Minute

71

2019/5/21

Agenda

See agenda page

Minute

70

2019/5/14

Agenda

See agenda page

Minute

69

2019/5/7

Agenda

See agenda page

Minute

68

2019/4/23

Agenda

See agenda page

Minute

67

2019/4/16

Agenda

See agenda page

Minute

66

2019/4/9

Agenda

See agenda page

Minute

65-1

2019/4/2

Integrated Type-A meeting

65

2019/4/2

Agenda

See agenda page

Minute

64

2019/3/26

Agenda

See agenda page

Minute

file

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1



Other meetings



Task list


Documents