Differences between revisions 1405 and 1629 (spanning 224 versions)
Revision 1405 as of 2019-10-18 13:23:37
Size: 24868
Comment:
Revision 1629 as of 2020-02-04 10:56:03
Size: 25357
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
[[https://teamup.com/ksc4nkchhmh4stoekm|KAGRA Comissioning task planner]]
Line 10: Line 12:
== Today's work plan: 2019/10/18 1PM - 2019/10/21 1PM ==

=== Afternoon ===
 * OSTM assembly (Takahashi, Sato)
 * ASC work at REFL table (Kokeyama, Terrence, Miyoki)
 * ISS work in/out PSL (Yoshioka)
 * Diagonalizaton for ASC work (Lucia, Yamada)
 * Replacement for coil driver for ETMX (Yamamoto, Yamada)
 * Putting covers (Hayakawa)

 * BS TF measurement (Fabian)
 * ITMs TF measurement (Lucia)


=== Evening ===
 * FPMI lock (Takano)
 * Noise budget (Takano)
 * VIS measurement with FPMI (Fujii)
 * ETMY actuator efficiency (Yamamoto)

=== Weekend ===
 * Saturday morning: Installation of ion pump around OMC (Mira-pro)
 * Saturday: REFL WFS work needs PRM (Kokeyama, Terrence)
 * Saturday afternoon: Fan on/off test (Yokozawa)
 * Saturday afternoon: Sound injection (Yokozawa)
 * VIS work for ASC (Licia)
 * TF measurement with IFO with no people (Lucia)
 * VIS measurement with FPMI (Fujii)
 * ETMY actuator efficiency (Yamamoto)


=== Oct. 21 Morning ===
 * BS TF measurement for ASC (Fabian)


||Configuration||silent-run slot ||Morning ||10/17 Afternoon ||Evening||
|| || || || || ||
||X-arm || || || || ||
||Y-arm || || || || ||
||MICH || || || || ||
||ALS-DARM || || || || ||
||FPMI || ||Nakano for recover||Nakano for fan off|| ||
||PFPMI ||Nakano || || ||Nakano ||
|| || || || || ||
||BS || ||Fabian || || ||
||ITMX || ||Lucia for ASC ||Lucia, Yamada || ||
||ITMY || || ||Lucia, Yamada || ||
||ETMX || ||Yamamoto ||Lucia, Yamada || ||
||PRM || ||Kokeyama || || ||
||SRM || || ||Lucia, Yamada || ||
||REFL port || ||Kokeyama ||Kokeyama || ||
||AS port || || ||Nakano || ||
== Items ==
 * Mine work
  * Beam jitter noise budget
  * ASC
  * Laser power increase
  * REFL table power budget
  * OMC
 * Remote work
  * Feedforward MICH
  * Offload path
  * ASC
  * Calibration check
  * Lock loss investigation [[http://10.68.10.87/~controls/washimi/LockLossStudy/]]


 * See the commissioning task planner:
  * [[https://teamup.com/ksc4nkchhmh4stoekm]]
Line 87: Line 55:
== Working people assignment ==
 * [[https://teamup.com/kswnmta8p18h6u1uab|KAGRA Commissioning Planner]]
== Tasks and working people assignment ==
 * [[https://teamup.com/ksc4nkchhmh4stoekm|KAGRA Comissioning task planner]]
 * [[https://teamup.com/ks
wnmta8p18h6u1uab|KAGRA commissioning people planner]]
Line 139: Line 108:

 * Vacuum pump noise measurement (Yokozawa)

 * Temperature stabilization due to fan off (Miyoki)
Line 158: Line 128:
||92||2020/2/4||[[KAGRA/Commissioning/Weekly/20200204/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20200204/Minute|Minute]]||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11453|File]]||
||91||2020/1/28||[[KAGRA/Commissioning/Weekly/20200128/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20200128/Minute|Minute]]||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11419|File]]||
||90||2020/1/14||[[KAGRA/Commissioning/Weekly/20200114/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20200114/Minute|Minute]]||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11370|File]]||
||89||2020/1/7||[[KAGRA/Commissioning/Weekly/20200107/Agenda|Agenda]]||See [[https://teamup.com/ksc4nkchhmh4stoekm|task planner page]]||[[KAGRA/Commissioning/Weekly/20200107/Minute|Minute]]|| ||
||88||2019/12/17||[[KAGRA/Commissioning/Weekly/20191217/Agenda|Agenda]]||See [[https://teamup.com/ksc4nkchhmh4stoekm|task planner page]]||[[KAGRA/Commissioning/Weekly/20191217/Minute|Minute]]|| ||
||87||2019/12/10||[[KAGRA/Commissioning/Weekly/20191210/Agenda|Agenda]]||See [[https://teamup.com/ksc4nkchhmh4stoekm|task planner page]]||[[KAGRA/Commissioning/Weekly/20191210/Minute|Minute]]|| ||
||86||2019/12/3||[[KAGRA/Commissioning/Weekly/20191203/Agenda|Agenda]]||See [[https://teamup.com/ksc4nkchhmh4stoekm|task planner page]]||[[KAGRA/Commissioning/Weekly/20191203/Minute|Minute]]||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11040|JGW-G1911040]]||
||85||2019/11/26||[[KAGRA/Commissioning/Weekly/20191126/Agenda|Agenda]]||See [[https://teamup.com/ksc4nkchhmh4stoekm|task planner page]]||[[KAGRA/Commissioning/Weekly/20191126/Minute|Minute]]||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11012|JGW-G1911012]][[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11010|JGW-G1911010]]||
||84||2019/11/19||[[KAGRA/Commissioning/Weekly/20191119/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20191119/Minute|Minute]]||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10998|File]]||
||83||2019/11/12||[[KAGRA/Commissioning/Weekly/20191112/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20191112/Minute|Minute]]|| ||

KAGRA Commissioning Wiki


KAGRA Comissioning task planner

Meeting archive

Items


Meetings


Tasks and working people assignment

Schedule

  • Cryo cooler check on 8/5 (Kimura)
  • ITMX cooler stop on 8/6 (CRY)
  • Y arm will be available from 8/8~
  • ETMX warm up 8/9 (CRY)
  • ETYY cooling (CRY)


Standing issues

VIS Task List

  • PEM - measured data sharing (Washimi, Yokozawa)
  • How to control the PSL temperature when people enters the room (Miyoki)
  • DRMI lock stability
    • 3f transition
    • Search for better Gouy phase in PRC
  • PRFRMI: with stable 3f signals and ALS extra range, FPPRMI may fix the glitches?
  • VIS related
    • Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
    • United Guardian for all 4 suspensions (Okutomi)
    • Damping
    • Type A: Feed forward technic to suppress extra motion (Nakano)
    • Automation script for damping for calm down phase
    • PR2 & PRM oplev wind shield, PR3 LS oplev centering

    • Wind shield for PR2 and PRM (Enomoto)
  • For ASC things
    • Fix clipping at IFI with IFO (Kokeyama)
    • Measure TF of VIS as ASC actuator (Okutomi)
    • One arm WFS test
  • ETMY strong damping (Lucia, Ushiba)
  • DAC non-linearity (http://klog.icrr.u-tokyo.ac.jp/osl/?r=10699)

  • QPD diagonalization ETMX and ETMY, for remote work (Akutsu)
  • Establishing investigation method for diagonalization using ETMY only (all VIS power)
  • Fix oplev noise for ITMY
  • Fix oplev noise for ITMX
  • Fix oplev gain for ETMY (Akutsu)
  • Covering wind shield for oplevs of iMC (Akutsu, or somebody)
  • Investigation for noise of length oplev noise for ITMs (VIS + CRY)
  • PD dark noise investigation (Kozakai)
  • Sensor correction for Type B by large motion like typhoon (Fabian)
  • Check for all PD or other circuits for grounding on table (Ushiba)
  • Gate valve test (Tomaru)
  • Vacuum pump noise measurement (Yokozawa)
  • Temperature stabilization due to fan off (Miyoki)


KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  



Weekly meeting

No.

Date

Agenda

Schedule

Minute

Files

92

2020/2/4

Agenda

Minute

File

91

2020/1/28

Agenda

Minute

File

90

2020/1/14

Agenda

Minute

File

89

2020/1/7

Agenda

See task planner page

Minute

88

2019/12/17

Agenda

See task planner page

Minute

87

2019/12/10

Agenda

See task planner page

Minute

86

2019/12/3

Agenda

See task planner page

Minute

JGW-G1911040

85

2019/11/26

Agenda

See task planner page

Minute

JGW-G1911012JGW-G1911010

84

2019/11/19

Agenda

See agenda page

Minute

File

83

2019/11/12

Agenda

See agenda page

Minute

82

2019/10/15

Agenda

See agenda page

Minute

81

2019/10/8

Agenda

See agenda page

Minute

80

2019/10/1

Agenda

See agenda page

Minute

file

79

2019/9/3

Agenda

See agenda page

Minute

78

2019/8/20

Agenda

See agenda page

Minute

File

77

2019/8/6

Agenda

See agenda page

Minute

76

2019/7/23

Agenda

See agenda page

Minute

75

2019/7/16

Agenda

See agenda page

Minute

74

2019/7/2

Agenda

See agenda page

Minute

73

2019/6/25

Agenda

See agenda page

Minute

72

2019/5/28

Agenda

See agenda page

Minute

71

2019/5/21

Agenda

See agenda page

Minute

70

2019/5/14

Agenda

See agenda page

Minute

69

2019/5/7

Agenda

See agenda page

Minute

68

2019/4/23

Agenda

See agenda page

Minute

67

2019/4/16

Agenda

See agenda page

Minute

66

2019/4/9

Agenda

See agenda page

Minute

65-1

2019/4/2

Integrated Type-A meeting

65

2019/4/2

Agenda

See agenda page

Minute

64

2019/3/26

Agenda

See agenda page

Minute

file

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1



Other meetings



Task list


Documents

Communication tools

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)