Line 10: Line 10:
== Today's work plan: 2019/11/1 1PM - 2019/11/5 1PM == == Today's work plan: 2019/11/8 1PM - 2019/11/9 1PM ==
Line 13: Line 13:
 * Gain adjustment for PD at both end (Takano, Yokozawa)
 * Check PRM with aligned state (Shoda)
 * Keeping FPMI locked (Takano, Ushiba, Aso)
 * ISS measurement (Yoshioka, Miyakawa)
 * TMS TF measurement using on QPD (K.Tanaka)
 * FPMI lock (Nakano, Takano)
 * Closing ASC loop for X arm until 3pm (Eleonora, Lucia, K.Tanaka, Ushiba)
 * Pcal calibration for X arm necessary ETMX alignment from 2pm to 4pm (Inoue, Darkhan)
 * ISS Guardian test (Miyakawa)
Line 20: Line 19:
 * FPMI lock (Takano, Aso)
 * TMS TF measurement using on QPD (K.Tanaka)
 * Measurement for Type A remotely in the night (Fujii)
 * ETMX and ITMX actuator efficiency (Yamamoto)

=== Weekend ===
 * Saturday
  * Yokozawa, Yamamoto
  * PEM acoustic or coil injection (T.Tanaka)

 * Sunday
  * Takano, Kokeyama, Yokozawa, Yamamoto, Miyakawa
  * Measurement for Type A remotely in the night (Fujii)
  * WFS work (Kokeyama)
  * MICH calibration (Yamamoto)

 * Monday
  * Takano, Kokeyama, Yokozawa, Yamamoto, Aso
  * WFS work (Kokeyama)
  * Measurement for Type A remotely in the night(Fujii)
  * MICH calibration (Yamamoto)

 * FPMI lock (Takano, Aso)
 * TMS TF measurement using on QPD (K.Tanaka)
 * ETMX and ITMX actuator efficiency (Yamamoto)


=== Nov. 5 Morning ===
 * FPMI lock (Takano, Ushiba)


||Configuration||11/1 silent-run slot||Morning ||10/31 Afternoon ||Evening || ||
 * Fixing PLL (Takano, Matteo)

=== Nov. 8 Morning ===
 * Fixing PLL for AOM alignment to avoid coupling PDH to intensity (Takano, Matteo)
 * Alignment check for ASC QPD (Eleonora, Lucia, Ushiba)


||Configuration||11/9 silent-run slot||Morning ||11/8 Afternoon ||Evening || ||
Line 53: Line 28:
||PSL || ||                  || || || ||
||X-arm || || ||         || || ||
||Y-arm || || || ||Yamamoto || ||
||PSL || ||Nakano, Takano ||Matteo || || ||
||X-arm || || ||Kokeyama || || ||
||Y-arm || || || ||                        || ||
Line 58: Line 33:
||FPMI || ||Takano ||Takano ||Takano || || ||FPMI || || ||   ||Nakano, Takano || ||
Line 62: Line 37:
||ITMX || || || ||Yamamoto || || ||ITMX || || || ||         || ||
Line 64: Line 39:
||ETMX || ||Takano || ||Yamamoto || ||
||ETMY || ||Takano || || || ||
||PRM || ||Fabian || || || ||
||ETMX || ||                  || || || ||
||ETMY || ||       || || || ||
||PRM || ||                  || || || ||

KAGRA Commissioning Wiki


Meeting archive

Today's work plan: 2019/11/8 1PM - 2019/11/9 1PM

Afternoon

  • FPMI lock (Nakano, Takano)
  • Closing ASC loop for X arm until 3pm (Eleonora, Lucia, K.Tanaka, Ushiba)
  • Pcal calibration for X arm necessary ETMX alignment from 2pm to 4pm (Inoue, Darkhan)
  • ISS Guardian test (Miyakawa)

Evening

  • Fixing PLL (Takano, Matteo)

Nov. 8 Morning

  • Fixing PLL for AOM alignment to avoid coupling PDH to intensity (Takano, Matteo)
  • Alignment check for ASC QPD (Eleonora, Lucia, Ushiba)

Configuration

11/9 silent-run slot

Morning

11/8 Afternoon

Evening

PSL

Nakano, Takano

Matteo

X-arm

Kokeyama

Y-arm

MICH

ALS-DARM

FPMI

Nakano, Takano

PFPMI

BS

ITMX

ITMY

ETMX

ETMY

PRM

PR2

SRM

REFL port

AS port


Meetings


Working people assignment

Schedule

  • Cryo cooler check on 8/5 (Kimura)
  • ITMX cooler stop on 8/6 (CRY)
  • Y arm will be available from 8/8~
  • ETMX warm up 8/9 (CRY)
  • ETYY cooling (CRY)


Standing issues

VIS Task List

  • PEM - measured data sharing (Washimi, Yokozawa)
  • How to control the PSL temperature when people enters the room (Miyoki)
  • DRMI lock stability
    • 3f transition
    • Search for better Gouy phase in PRC
  • PRFRMI: with stable 3f signals and ALS extra range, FPPRMI may fix the glitches?
  • VIS related
    • Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
    • United Guardian for all 4 suspensions (Okutomi)
    • Damping
    • Type A: Feed forward technic to suppress extra motion (Nakano)
    • Automation script for damping for calm down phase
    • PR2 & PRM oplev wind shield, PR3 LS oplev centering

    • Wind shield for PR2 and PRM (Enomoto)
  • For ASC things
    • Fix clipping at IFI with IFO (Kokeyama)
    • Measure TF of VIS as ASC actuator (Okutomi)
    • One arm WFS test
  • ETMY strong damping (Lucia, Ushiba)
  • DAC non-linearity (http://klog.icrr.u-tokyo.ac.jp/osl/?r=10699)

  • QPD diagonalization ETMX and ETMY, for remote work (Akutsu)
  • Establishing investigation method for diagonalization using ETMY only (all VIS power)
  • Fix oplev noise for ITMY
  • Fix oplev noise for ITMX
  • Fix oplev gain for ETMY (Akutsu)
  • Covering wind shield for oplevs of iMC (Akutsu, or somebody)
  • Investigation for noise of length oplev noise for ITMs (VIS + CRY)
  • PD dark noise investigation (Kozakai)
  • Sensor correction for Type B by large motion like typhoon (Fabian)
  • Check for all PD or other circuits for grounding on table (Ushiba)
  • Gate valve test (Tomaru)
  • Vacuum pump noise measurement (Yokozawa)
  • Temperature stabilization due to fan off (Miyoki)


KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  



Weekly meeting

No.

Date

Agenda

Schedule

Minute

Files

82

2019/10/15

Agenda

See agenda page

Minute

81

2019/10/8

Agenda

See agenda page

Minute

80

2019/10/1

Agenda

See agenda page

Minute

file

79

2019/9/3

Agenda

See agenda page

Minute

78

2019/8/20

Agenda

See agenda page

Minute

File

77

2019/8/6

Agenda

See agenda page

Minute

76

2019/7/23

Agenda

See agenda page

Minute

75

2019/7/16

Agenda

See agenda page

Minute

74

2019/7/2

Agenda

See agenda page

Minute

73

2019/6/25

Agenda

See agenda page

Minute

72

2019/5/28

Agenda

See agenda page

Minute

71

2019/5/21

Agenda

See agenda page

Minute

70

2019/5/14

Agenda

See agenda page

Minute

69

2019/5/7

Agenda

See agenda page

Minute

68

2019/4/23

Agenda

See agenda page

Minute

67

2019/4/16

Agenda

See agenda page

Minute

66

2019/4/9

Agenda

See agenda page

Minute

65-1

2019/4/2

Integrated Type-A meeting

65

2019/4/2

Agenda

See agenda page

Minute

64

2019/3/26

Agenda

See agenda page

Minute

file

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1



Other meetings



Task list


Documents

Communication tools

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)