25683
Comment:
|
26163
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
== Today's work plan: 2019/11/7 1PM - 2019/11/8 1PM == | == Today's work plan: 2019/11/8 1PM - 2019/11/11 1PM == |
Line 13: | Line 13: |
* Fixing PLL for GRX (Matteo, Aso) * Closing ASC loop for X arm (Eleonora, Lucia, K.Tanaka) * Assembling OSTM (Takahashi) * Measurement on IMC for FSS (Nakano) * OMC assembly (Aso) * Absolute power measurement for PCal at ETMY (Inoue, Darkhan) |
* FPMI lock trial (Nakano, Takano) * Closing ASC loop for X arm until 3pm (Eleonora, Lucia, K.Tanaka, Ushiba) * Pcal calibration for X arm necessary ETMX alignment from 2pm to 4pm (Inoue, Darkhan) * ISS Guardian test (Miyakawa) |
Line 21: | Line 19: |
* Fixing PLL (Takano, Matteo) === Nov. 8 Morning === * OSTM (Takahashi) * Fixing PLL (Takano, Matteo) * OMC assembly (Aso) * Closing ASC loop for X arm (Eleonora, Lucia) ||Configuration||11/8 silent-run slot||Morning ||11/7 Afternoon ||Evening || || || || || || || || || ||PSL || ||Aso, Takano ||Matteo || || || ||X-arm || || ||Kokeyama || || || |
* FPMI lock trial (Nakano, Takano) === Weekend === * FPMI lock trial (Nakano, Takano) * MC work for replacing FSS (Nakano) * Type A measurement with FPMI (Fujii) === Nov. 11 Morning === * DGS maintenance. * Jumper setting for ETMX HPCD (Shimode, Yamamoto) * Replacement DC power supply for PRM and PR3 (Tomura, Kamiizumi) * Exchanging FW1 computer (Oshino) * Checking ground loop TMSX and TMSY (Yokozawa, T.Tanaka) * Modifying RT model for all Type A, needs safe mode (Okutomi, Yamada) * Preparation for OMC work (Aso) ||Configuration||11/11 silent-run slot||Morning ||11/8 Afternoon ||Evening ||Weekend || || || ||Maintenance || || || || ||PSL || || ||ASC ~3pm || || || ||IMC || || ||ASC ~3pm || ||Nakano || ||X-arm || || || || || || |
Line 37: | Line 43: |
||FPMI || || || ||Nakano, Takano || || | ||FPMI || || ||LSC 3pm~ ||LSC ||LSC || |
Line 43: | Line 49: |
||ETMX || || || || || || | ||ETMX || || ||Pcal || || || |
KAGRA Commissioning Wiki
Contents
Today's work plan: 2019/11/8 1PM - 2019/11/11 1PM
Afternoon
- FPMI lock trial (Nakano, Takano)
- Closing ASC loop for X arm until 3pm (Eleonora, Lucia, K.Tanaka, Ushiba)
- Pcal calibration for X arm necessary ETMX alignment from 2pm to 4pm (Inoue, Darkhan)
- ISS Guardian test (Miyakawa)
Evening
- FPMI lock trial (Nakano, Takano)
Weekend
- FPMI lock trial (Nakano, Takano)
- MC work for replacing FSS (Nakano)
- Type A measurement with FPMI (Fujii)
Nov. 11 Morning
- DGS maintenance.
- Jumper setting for ETMX HPCD (Shimode, Yamamoto)
- Replacement DC power supply for PRM and PR3 (Tomura, Kamiizumi)
- Exchanging FW1 computer (Oshino)
- Checking ground loop TMSX and TMSY (Yokozawa, T.Tanaka)
- Modifying RT model for all Type A, needs safe mode (Okutomi, Yamada)
- Preparation for OMC work (Aso)
Configuration |
11/11 silent-run slot |
Morning |
11/8 Afternoon |
Evening |
Weekend |
|
|
Maintenance |
|
|
|
PSL |
|
|
ASC ~3pm |
|
|
IMC |
|
|
ASC ~3pm |
|
Nakano |
X-arm |
|
|
|
|
|
Y-arm |
|
|
|
|
|
MICH |
|
|
|
|
|
ALS-DARM |
|
|
|
|
|
FPMI |
|
|
LSC 3pm~ |
LSC |
LSC |
PFPMI |
|
|
|
|
|
|
|
|
|
|
|
BS |
|
|
|
|
|
ITMX |
|
|
|
|
|
ITMY |
|
|
|
|
|
ETMX |
|
|
Pcal |
|
|
ETMY |
|
|
|
|
|
PRM |
|
|
|
|
|
PR2 |
|
|
|
|
|
SRM |
|
|
|
|
|
REFL port |
|
|
|
|
|
AS port |
|
|
|
|
|
Meetings
Zoom 1 URL: https://zoom.us/j/7631499341
- Time: 4PM, everyday
- Location: KAGRA control room
Zoom 1 URL: https://zoom.us/j/7631499341
- Time: 9AM, everyday
- Location: KAGRA control room
Zoom 2 URL: https://zoom.us/j/6676627462
- Time: 11AM, every Tuesday
- Location: 2F large meeting room
Working people assignment
Schedule
- Cryo cooler check on 8/5 (Kimura)
- ITMX cooler stop on 8/6 (CRY)
- Y arm will be available from 8/8~
- ETMX warm up 8/9 (CRY)
- ETYY cooling (CRY)
Standing issues
- PEM - measured data sharing (Washimi, Yokozawa)
- How to control the PSL temperature when people enters the room (Miyoki)
- DRMI lock stability
- 3f transition
- Search for better Gouy phase in PRC
- PRFRMI: with stable 3f signals and ALS extra range, FPPRMI may fix the glitches?
- VIS related
- Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
- United Guardian for all 4 suspensions (Okutomi)
- Damping
- Type A: Feed forward technic to suppress extra motion (Nakano)
- Automation script for damping for calm down phase
PR2 & PRM oplev wind shield, PR3 LS oplev centering
- Wind shield for PR2 and PRM (Enomoto)
- For ASC things
- Fix clipping at IFI with IFO (Kokeyama)
- Measure TF of VIS as ASC actuator (Okutomi)
- One arm WFS test
- ETMY strong damping (Lucia, Ushiba)
DAC non-linearity (http://klog.icrr.u-tokyo.ac.jp/osl/?r=10699)
- QPD diagonalization ETMX and ETMY, for remote work (Akutsu)
- Establishing investigation method for diagonalization using ETMY only (all VIS power)
- Fix oplev noise for ITMY
- Fix oplev noise for ITMX
- Fix oplev gain for ETMY (Akutsu)
- Covering wind shield for oplevs of iMC (Akutsu, or somebody)
- Investigation for noise of length oplev noise for ITMs (VIS + CRY)
- PD dark noise investigation (Kozakai)
- Sensor correction for Type B by large motion like typhoon (Fabian)
- Check for all PD or other circuits for grounding on table (Ushiba)
- Gate valve test (Tomaru)
- Vacuum pump noise measurement (Yokozawa)
- Temperature stabilization due to fan off (Miyoki)
KAGRA/Commissioning/DailyWork << < 2024 / 11 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 |
Weekly meeting
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
82 |
2019/10/15 |
See agenda page |
|
||
81 |
2019/10/8 |
See agenda page |
|
||
80 |
2019/10/1 |
See agenda page |
|||
79 |
2019/9/3 |
See agenda page |
|
||
78 |
2019/8/20 |
See agenda page |
|||
77 |
2019/8/6 |
See agenda page |
|||
76 |
2019/7/23 |
See agenda page |
|||
75 |
2019/7/16 |
See agenda page |
|||
74 |
2019/7/2 |
See agenda page |
|||
73 |
2019/6/25 |
See agenda page |
|||
72 |
2019/5/28 |
See agenda page |
|||
71 |
2019/5/21 |
See agenda page |
|||
70 |
2019/5/14 |
See agenda page |
|||
69 |
2019/5/7 |
See agenda page |
|||
68 |
2019/4/23 |
See agenda page |
|||
67 |
2019/4/16 |
See agenda page |
|||
66 |
2019/4/9 |
See agenda page |
|||
65-1 |
2019/4/2 |
|
|
|
|
65 |
2019/4/2 |
See agenda page |
|||
64 |
2019/3/26 |
See agenda page |
|||
63 |
2019/3/11 |
See agenda page |
|
||
62 |
2019/3/5 |
See agenda page |
|
||
61 |
2019/2/19 |
See agenda page |
|
||
60 |
2019/2/5 |
See agenda page |
|
||
59 |
2019/1/29 |
|
|
||
58 |
2019/1/22 |
|
|
||
57 |
2019/1/8 |
|
|
||
56 |
2018/12/25 |
|
|
||
55 |
2018/12/17 |
|
|
||
54 |
2018/12/11 |
|
|
||
53 |
2018/12/4 |
|
|
||
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)
Task list
Documents
Communication tools
- wiki
Task assignment list ([[https://docs.google.com/spreadsheets/d/1qipguowxaEbEEV9LYxvHR_aMBxn0Evsl