Today's work plan: 2019/11/15 1PM - 2019/11/16 1PM
Afternoon
- ASC work for Y arm or X arm (Eleonora, Lucia, K.Tanaka)
- Fixing phase noise cancel for both X, Y green (Nakano)
- ISS noise measurement (Yoshioka, Miyakawa)
- PEM turn on vacuum pump aound 3pm (Yokozawa, Washimi)
- Entering PSL shortly (Kokeyama)
- Laser power for PCal needs EX alignment (Yamamoto)
Evening
- FPMI lock (Nakano)
Weekend
- FPMI lock (Nakano)
- VIS noise budget (Lucia, Ushiba)
- Type A measurement on Saturday morning (Fujii)
- PEM measurement with FPMI on Sunday daytime
- ETMY calibration on Sunday mornintg (Ogaki)
- Injection of cal line during silent run (Yamamoto)
- Implementation roll off filter (Yamada)
Nov. 18 Morning
- ASC work for FPMI (Eleonora, Lucia, K.Tanaka)
- PEM work around ISS table (Yokozawa)
- OMC assembling for gluing mirror(Aso)
| Configuration | 11/18 silent-run slot | Morning | 11/15 Afternoon | Evening | Weekend | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
| PSL | 
 | 
 | 
 | 
 | 
 | 
| IMC | 
 | 
 | 
 | 
 | 
 | 
| X-arm | ASC | 
 | ASC | 
 | 
 | 
| Y-arm | ASC | 
 | 
 | 
 | 
 | 
| MICH | 
 | 
 | 
 | 
 | 
 | 
| ALS-DARM | 
 | 
 | 
 | 
 | 
 | 
| FPMI | ASC | 
 | Nakano | Nakano | 
 | 
| PFPMI | 
 | 
 | 
 | 
 | 
 | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
| BS | 
 | 
 | 
 | 
 | 
 | 
| ITMX | 
 | 
 | 
 | 
 | 
 | 
| ITMY | 
 | 
 | 
 | 
 | 
 | 
| ETMX | 
 | 
 | 
 | 
 | 
 | 
| ETMY | 
 | 
 | 
 | 
 | 
 | 
| PRM | 
 | 
 | 
 | 
 | 
 | 
| PR2 | 
 | 
 | 
 | 
 | 
 | 
| SRM | 
 | 
 | 
 | 
 | 
 | 
| REFL port | 
 | 
 | ASC | 
 | 
 | 
| POP port | 
 | 
 | ASC | 
 | 
 | 
| AS port | 
 | 
 | 
 | 
 | 
 | 
Meetings
- Zoom 1 URL: https://zoom.us/j/7631499341 
- Time: 4PM, everyday
- Location: KAGRA control room
 
- Zoom 1 URL: https://zoom.us/j/7631499341 
- Time: 9AM, everyday
- Location: KAGRA control room
 
- Zoom 2 URL: https://zoom.us/j/6676627462 
- Time: 11AM, every Tuesday
- Location: 2F large meeting room
 
Working people assignment
Schedule
- Cryo cooler check on 8/5 (Kimura)
- ITMX cooler stop on 8/6 (CRY)
- Y arm will be available from 8/8~
- ETMX warm up 8/9 (CRY)
- ETYY cooling (CRY)
Standing issues
- PEM - measured data sharing (Washimi, Yokozawa)
- How to control the PSL temperature when people enters the room (Miyoki)
- DRMI lock stability - 3f transition
- Search for better Gouy phase in PRC
 
- PRFRMI: with stable 3f signals and ALS extra range, FPPRMI may fix the glitches?
- VIS related - Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
- United Guardian for all 4 suspensions (Okutomi)
- Damping
- Type A: Feed forward technic to suppress extra motion (Nakano)
- Automation script for damping for calm down phase
- PR2 & PRM oplev wind shield, PR3 LS oplev centering 
- Wind shield for PR2 and PRM (Enomoto)
 
- For ASC things - Fix clipping at IFI with IFO (Kokeyama)
- Measure TF of VIS as ASC actuator (Okutomi)
- One arm WFS test
 
- ETMY strong damping (Lucia, Ushiba)
- DAC non-linearity (http://klog.icrr.u-tokyo.ac.jp/osl/?r=10699) 
- QPD diagonalization ETMX and ETMY, for remote work (Akutsu)
- Establishing investigation method for diagonalization using ETMY only (all VIS power)
- Fix oplev noise for ITMY
- Fix oplev noise for ITMX
- Fix oplev gain for ETMY (Akutsu)
- Covering wind shield for oplevs of iMC (Akutsu, or somebody)
- Investigation for noise of length oplev noise for ITMs (VIS + CRY)
- PD dark noise investigation (Kozakai)
- Sensor correction for Type B by large motion like typhoon (Fabian)
- Check for all PD or other circuits for grounding on table (Ushiba)
- Gate valve test (Tomaru)
- Vacuum pump noise measurement (Yokozawa)
- Temperature stabilization due to fan off (Miyoki)
| KAGRA/Commissioning/DailyWork << < 2025 / 11 > >> | ||||||
|---|---|---|---|---|---|---|
| Mon | Tue | Wed | Thu | Fri | Sat | Sun | 
| 1 | 2 | |||||
| 3 | 4 | 5 | 6 | 7 | 8 | 9 | 
| 10 | 11 | 12 | 13 | 14 | 15 | 16 | 
| 17 | 18 | 19 | 20 | 21 | 22 | 23 | 
| 24 | 25 | 26 | 27 | 28 | 29 | 30 | 
Weekly meeting
| No. | Date | Agenda | Schedule | Minute | Files | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
| 83 | 2019/11/12 | See agenda page | 
 | ||
| 82 | 2019/10/15 | See agenda page | 
 | ||
| 81 | 2019/10/8 | See agenda page | 
 | ||
| 80 | 2019/10/1 | See agenda page | |||
| 79 | 2019/9/3 | See agenda page | 
 | ||
| 78 | 2019/8/20 | See agenda page | |||
| 77 | 2019/8/6 | See agenda page | |||
| 76 | 2019/7/23 | See agenda page | |||
| 75 | 2019/7/16 | See agenda page | |||
| 74 | 2019/7/2 | See agenda page | |||
| 73 | 2019/6/25 | See agenda page | |||
| 72 | 2019/5/28 | See agenda page | |||
| 71 | 2019/5/21 | See agenda page | |||
| 70 | 2019/5/14 | See agenda page | |||
| 69 | 2019/5/7 | See agenda page | |||
| 68 | 2019/4/23 | See agenda page | |||
| 67 | 2019/4/16 | See agenda page | |||
| 66 | 2019/4/9 | See agenda page | |||
| 65-1 | 2019/4/2 | 
 | 
 | 
 | |
| 65 | 2019/4/2 | See agenda page | |||
| 64 | 2019/3/26 | See agenda page | |||
| 63 | 2019/3/11 | See agenda page | 
 | ||
| 62 | 2019/3/5 | See agenda page | 
 | ||
| 61 | 2019/2/19 | See agenda page | 
 | ||
| 60 | 2019/2/5 | See agenda page | 
 | ||
| 59 | 2019/1/29 | 
 | 
 | ||
| 58 | 2019/1/22 | 
 | 
 | ||
| 57 | 2019/1/8 | 
 | 
 | ||
| 56 | 2018/12/25 | 
 | 
 | ||
| 55 | 2018/12/17 | 
 | 
 | ||
| 54 | 2018/12/11 | 
 | 
 | ||
| 53 | 2018/12/4 | 
 | 
 | ||
| 52 | 2018/11/27 | 
 | 
 | ||
| 51 | 2018/11/20 | 
 | 
 | ||
| 50 | 2018/11/13 | 
 | 
 | ||
| 49 | 2018/11/6 | 
 | 
 | ||
| 48 | 2018/10/30 | 
 | 
 | ||
| 47 | 2018/10/23 | 
 | 
 | ||
| 46 | 2018/10/16 | 
 | 
 | ||
| 45 | 2018/10/9 | 
 | |||
| 44 | 2018/10/2 | 
 | |||
| 43 | 2018/9/18 | 
 | |||
| 42 | 2018/9/4 | 
 | |||
| 41 | 2018/8/28 | 
 | |||
| 40 | 2018/8/21 | 
 | |||
| 39 | 2018/8/7 | 
 | |||
| 38 | 2018/7/31 | 
 | |||
| 37 | 2018/7/24 | 
 | |||
| 36 | 2018/7/17 | 
 | |||
| 35 | 2018/7/3 | 
 | |||
| 34 | 2018/6/26 | 
 | |||
| 33 | 2018/6/19 | 
 | |||
| 32 | 2018/6/12 | 
 | |||
| 31 | 2018/6/5 | 
 | |||
| 30 | 2018/5/22 | 
 | |||
| 29 | 2018/5/8 | 
 | |||
| 28 | 2018/5/1 | 
 | |||
| 27 | 2018/4/17 | 
 | |||
| 26 | 2018/4/10 | 
 | |||
| 25 | 2018/4/3 | 
 | |||
| 24 | 2018/3/27 | 
 | |||
| 23 | 2018/3/20 | 
 | |||
| 22 | 2018/3/13 | 
 | |||
| 21 | 2018/3/6 | 
 | |||
| 20 | 2018/2/27 | 
 | |||
| 19 | 2018/2/20 | 
 | |||
| 18 | 2018/2/13 | 
 | |||
| 17 | 2018/2/6 | 
 | |||
| 16 | 2018/1/30 | 
 | |||
| 15 | 2018/1/23 | 
 | |||
| 14 | 2018/1/16 | 
 | |||
| 13 | 2018/1/9 | 
 | |||
| 12 | 2017/12/19 | 
 | |||
| 11 | 2017/12/12 | 
 | |||
| 10 | 2017/11/28 | 
 | |||
| 9 | 2017/11/14 | 
 | |||
| 8 | 2017/11/7 | 
 | |||
| 7 | 2017/10/31 | 
 | |||
| 6 | 2017/10/24 | 
 | |||
| 5 | 2017/10/17 | 
 | |||
| 4 | 2017/10/10 | 
 | 
 | ||
| 3 | 2017/10/3 | 
 | |||
| 2 | 2017/9/26 | 
 | |||
| 1 | 2017/9/19 | 
 | 
 | 
 | 
Other meetings
- 2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute 
- 2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list) 
- 2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list) 
- 2018/8/16: Meeting for pump down at ITMX (Minute, Check list) 
- 2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting. 
- 2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list) 
- 2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list) 
- 2018/3/14: Meeting for pump down test at Center are (Minute, Check list) 
- 2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list) 
- 2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list) 
- 2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list) 
- 2017/12/13: Meeting for pump down at ETMY (Minute, schedule) 
- 2017/11/27~12/1Commissioning Workshop 2017 
- 2017/11/17: Meeting for closing ETY (Minute) 
- 2017/10/12: Meeting about PR2 pitch misalignment (Minute) 
Task list
Documents
Communication tools
- wiki
- Task assignment list ([[https://docs.google.com/spreadsheets/d/1qipguowxaEbEEV9LYxvHR_aMBxn0Evsl 