KAGRA Commissioning Wiki
Contents
Today's work plan: 2019/11/18 1PM - 2019/11/19 1PM
Afternoon
- ASC work for measuring demodulation phase for AS using Y arm (Lucia, Ushiba, Nakano, Anamaria)
 - ISC meeting for ASC things from 2pm (Michimura leads)
 - OMC assembling for gluing a mirrro (Aso)
 - Modification for DAQ guardian (Yamamoto)
 - Pcal shutter (Yamamoto)
 
Evening
- FPMI lock (Nakano) 
- Fix find resonance routine (Nakano)
 
 - PRMI lock (Nakano)
 - VIS noise budget (Lucia, Ushiba)
 - ETMY calibration (Ogaki)
 
Nov. 19 Morning
- ASC work (Ushiba, Lucia)
 - ETMY calibration (Ogaki)
 
Configuration  | 
  11/19 silent-run slot  | 
  Morning  | 
  11/18 Afternoon  | 
  Evening  | 
  Weekend  | 
  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
  | 
  
  | 
  DGS maintenance  | 
  
  | 
  
  | 
  VIS noise budget, Type A measurement, Injection  | 
  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
PSL  | 
  
  | 
  
  | 
  Kokeyama  | 
  
  | 
  
  | 
IMC  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
X-arm  | 
  
  | 
  ASC  | 
  ASC, PCal  | 
  
  | 
  
  | 
Y-arm  | 
  
  | 
  ASC  | 
  ASC  | 
  
  | 
  
  | 
MICH  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
ALS-DARM  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
FPMI  | 
  
  | 
  ASC  | 
  Nakano  | 
  Nakano, Yamada  | 
  Nakano, Yamada  | 
PFPMI  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
BS  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
ITMX  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
ITMY  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
ETMX  | 
  
  | 
  Tomaru  | 
  PCal  | 
  
  | 
  Ogaki on Sun. morning  | 
ETMY  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
PRM  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
PR2  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
SRM  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
REFL port  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
POP port  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
AS port  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
Meetings
Zoom 1 URL: https://zoom.us/j/7631499341
- Time: 4PM, everyday
 - Location: KAGRA control room
 
Zoom 1 URL: https://zoom.us/j/7631499341
- Time: 9AM, everyday
 - Location: KAGRA control room
 
Zoom 2 URL: https://zoom.us/j/6676627462
- Time: 11AM, every Tuesday
 - Location: 2F large meeting room
 
Tasks and working people assignment
Schedule
- Cryo cooler check on 8/5 (Kimura)
 - ITMX cooler stop on 8/6 (CRY)
 - Y arm will be available from 8/8~
 - ETMX warm up 8/9 (CRY)
 - ETYY cooling (CRY)
 
Standing issues
- PEM - measured data sharing (Washimi, Yokozawa)
 - How to control the PSL temperature when people enters the room (Miyoki)
 - DRMI lock stability 
- 3f transition
 - Search for better Gouy phase in PRC
 
 - PRFRMI: with stable 3f signals and ALS extra range, FPPRMI may fix the glitches?
 - VIS related 
- Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
 - United Guardian for all 4 suspensions (Okutomi)
 - Damping
 - Type A: Feed forward technic to suppress extra motion (Nakano)
 - Automation script for damping for calm down phase
 PR2 & PRM oplev wind shield, PR3 LS oplev centering
- Wind shield for PR2 and PRM (Enomoto)
 
 - For ASC things 
- Fix clipping at IFI with IFO (Kokeyama)
 - Measure TF of VIS as ASC actuator (Okutomi)
 - One arm WFS test
 
 - ETMY strong damping (Lucia, Ushiba)
 DAC non-linearity (http://klog.icrr.u-tokyo.ac.jp/osl/?r=10699)
- QPD diagonalization ETMX and ETMY, for remote work (Akutsu)
 - Establishing investigation method for diagonalization using ETMY only (all VIS power)
 - Fix oplev noise for ITMY
 - Fix oplev noise for ITMX
 - Fix oplev gain for ETMY (Akutsu)
 - Covering wind shield for oplevs of iMC (Akutsu, or somebody)
 - Investigation for noise of length oplev noise for ITMs (VIS + CRY)
 - PD dark noise investigation (Kozakai)
 - Sensor correction for Type B by large motion like typhoon (Fabian)
 - Check for all PD or other circuits for grounding on table (Ushiba)
 - Gate valve test (Tomaru)
 - Vacuum pump noise measurement (Yokozawa)
 - Temperature stabilization due to fan off (Miyoki)
 
| 
   KAGRA/Commissioning/DailyWork << < 2025 / 11 > >>  | 
 ||||||
|---|---|---|---|---|---|---|
| Mon | Tue | Wed | Thu | Fri | Sat | Sun | 
| 1 | 2 | |||||
| 3 | 4 | 5 | 6 | 7 | 8 | 9 | 
| 10 | 11 | 12 | 13 | 14 | 15 | 16 | 
| 17 | 18 | 19 | 20 | 21 | 22 | 23 | 
| 24 | 25 | 26 | 27 | 28 | 29 | 30 | 
Weekly meeting
No.  | 
  Date  | 
  Agenda  | 
  Schedule  | 
  Minute  | 
  Files  | 
  | 
  
  | 
  
  | 
  
  | 
  
  | 
  
  | 
83  | 
  2019/11/12  | 
  See agenda page  | 
  
  | 
||
82  | 
  2019/10/15  | 
  See agenda page  | 
  
  | 
||
81  | 
  2019/10/8  | 
  See agenda page  | 
  
  | 
||
80  | 
  2019/10/1  | 
  See agenda page  | 
  |||
79  | 
  2019/9/3  | 
  See agenda page  | 
  
  | 
||
78  | 
  2019/8/20  | 
  See agenda page  | 
  |||
77  | 
  2019/8/6  | 
  See agenda page  | 
  |||
76  | 
  2019/7/23  | 
  See agenda page  | 
  |||
75  | 
  2019/7/16  | 
  See agenda page  | 
  |||
74  | 
  2019/7/2  | 
  See agenda page  | 
  |||
73  | 
  2019/6/25  | 
  See agenda page  | 
  |||
72  | 
  2019/5/28  | 
  See agenda page  | 
  |||
71  | 
  2019/5/21  | 
  See agenda page  | 
  |||
70  | 
  2019/5/14  | 
  See agenda page  | 
  |||
69  | 
  2019/5/7  | 
  See agenda page  | 
  |||
68  | 
  2019/4/23  | 
  See agenda page  | 
  |||
67  | 
  2019/4/16  | 
  See agenda page  | 
  |||
66  | 
  2019/4/9  | 
  See agenda page  | 
  |||
65-1  | 
  2019/4/2  | 
  
  | 
  
  | 
  
  | 
|
65  | 
  2019/4/2  | 
  See agenda page  | 
  |||
64  | 
  2019/3/26  | 
  See agenda page  | 
  |||
63  | 
  2019/3/11  | 
  See agenda page  | 
  
  | 
||
62  | 
  2019/3/5  | 
  See agenda page  | 
  
  | 
||
61  | 
  2019/2/19  | 
  See agenda page  | 
  
  | 
||
60  | 
  2019/2/5  | 
  See agenda page  | 
  
  | 
||
59  | 
  2019/1/29  | 
  
  | 
  
  | 
||
58  | 
  2019/1/22  | 
  
  | 
  
  | 
||
57  | 
  2019/1/8  | 
  
  | 
  
  | 
||
56  | 
  2018/12/25  | 
  
  | 
  
  | 
||
55  | 
  2018/12/17  | 
  
  | 
  
  | 
||
54  | 
  2018/12/11  | 
  
  | 
  
  | 
||
53  | 
  2018/12/4  | 
  
  | 
  
  | 
||
52  | 
  2018/11/27  | 
  
  | 
  
  | 
||
51  | 
  2018/11/20  | 
  
  | 
  
  | 
||
50  | 
  2018/11/13  | 
  
  | 
  
  | 
||
49  | 
  2018/11/6  | 
  
  | 
  
  | 
||
48  | 
  2018/10/30  | 
  
  | 
  
  | 
||
47  | 
  2018/10/23  | 
  
  | 
  
  | 
||
46  | 
  2018/10/16  | 
  
  | 
  
  | 
||
45  | 
  2018/10/9  | 
  
  | 
|||
44  | 
  2018/10/2  | 
  
  | 
|||
43  | 
  2018/9/18  | 
  
  | 
|||
42  | 
  2018/9/4  | 
  
  | 
|||
41  | 
  2018/8/28  | 
  
  | 
|||
40  | 
  2018/8/21  | 
  
  | 
|||
39  | 
  2018/8/7  | 
  
  | 
|||
38  | 
  2018/7/31  | 
  
  | 
|||
37  | 
  2018/7/24  | 
  
  | 
|||
36  | 
  2018/7/17  | 
  
  | 
|||
35  | 
  2018/7/3  | 
  
  | 
|||
34  | 
  2018/6/26  | 
  
  | 
|||
33  | 
  2018/6/19  | 
  
  | 
|||
32  | 
  2018/6/12  | 
  
  | 
|||
31  | 
  2018/6/5  | 
  
  | 
|||
30  | 
  2018/5/22  | 
  
  | 
|||
29  | 
  2018/5/8  | 
  
  | 
|||
28  | 
  2018/5/1  | 
  
  | 
|||
27  | 
  2018/4/17  | 
  
  | 
|||
26  | 
  2018/4/10  | 
  
  | 
|||
25  | 
  2018/4/3  | 
  
  | 
|||
24  | 
  2018/3/27  | 
  
  | 
|||
23  | 
  2018/3/20  | 
  
  | 
|||
22  | 
  2018/3/13  | 
  
  | 
|||
21  | 
  2018/3/6  | 
  
  | 
|||
20  | 
  2018/2/27  | 
  
  | 
|||
19  | 
  2018/2/20  | 
  
  | 
|||
18  | 
  2018/2/13  | 
  
  | 
|||
17  | 
  2018/2/6  | 
  
  | 
|||
16  | 
  2018/1/30  | 
  
  | 
|||
15  | 
  2018/1/23  | 
  
  | 
|||
14  | 
  2018/1/16  | 
  
  | 
|||
13  | 
  2018/1/9  | 
  
  | 
|||
12  | 
  2017/12/19  | 
  
  | 
|||
11  | 
  2017/12/12  | 
  
  | 
|||
10  | 
  2017/11/28  | 
  
  | 
|||
9  | 
  2017/11/14  | 
  
  | 
|||
8  | 
  2017/11/7  | 
  
  | 
|||
7  | 
  2017/10/31  | 
  
  | 
  |||
6  | 
  2017/10/24  | 
  
  | 
  |||
5  | 
  2017/10/17  | 
  
  | 
  |||
4  | 
  2017/10/10  | 
  
  | 
  
  | 
  ||
3  | 
  2017/10/3  | 
  
  | 
  |||
2  | 
  2017/9/26  | 
  
  | 
  |||
1  | 
  2017/9/19  | 
  
  | 
  
  | 
  
  | 
  
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)
Task list
Documents
Communication tools
- wiki
 Task assignment list ([[https://docs.google.com/spreadsheets/d/1qipguowxaEbEEV9LYxvHR_aMBxn0Evsl