||'''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || ## page was renamed from LCGT/subgroup/vis
Line 3: Line 3:
= VIS =

'''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer.
Line 6: Line 9:
== Vibration Isolation ==
 . Chief: R. Takahashi(ICRR)
 . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)
== Space for VIS-internal use ==

=== Quick announcement ===

=== Frequently used links ===
 * '''VIS meeting''': From 14:00 (JST) on every Friday - [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]
Line 11: Line 17:
== Weekly EVO Meeting ==
 . Every Wednesday, 21:00(JST)
== VIS Upgrades ==
Line 14: Line 19:
=== The 8th (18 May, 2011) ===
 . [[attachment:LCGT/subgroup/vis/magicwand.png|Magic wands by Takanori]]

=== The 7th (11 May, 2011) ===
 . [[attachment:LCGT/subgroup/vis/rep110511.pdf|Report by Takanori]]

=== The 6th (27 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/dimension110427.docx|Payload dimensions by Riccardo]]

=== The 5th (20 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/3D_model.pdf|Parameter Configuration by Ettore]]

=== (11 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]]

=== The 4th (6 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/10-30_April06.docx|Simulation by Ettore]]
 . [[attachment:LCGT/subgroup/vis/sequence110406.pdf|Installation sequence by Riccardo]]

=== The 3rd (30 March, 2011) ===
 . [[attachment:LCGT/subgroup/vis/coordinate110330.pdf|Coordinate system by Ryutaro]]
 . [[attachment:LCGT/subgroup/vis/110330_isasA.pdf|Simulation by Takanori]]

=== The 2nd (23 March, 2011) ===
 . [[attachment:LCGT/subgroup/vis/memo110323.txt|Comments by Riccardo]]
 . [[attachment:LCGT/subgroup/vis/report110323.doc|Status report by Riccardo]]
 . [[attachment:LCGT/subgroup/vis/sim110323.pptx|Simulation by Ettore]]

=== The 1st (16 March, 2011) ===
 . [[attachment:LCGT/subgroup/vis/Tower-a.pdf|Design for Type-A system]]
 . [[attachment:LCGT/subgroup/vis/filter-chain.pdf|Detail of filter's chain]]
[[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]]
Line 47: Line 22:
== LCGT防振系作業部会(2009) ==
=== 第6回 ===
 . 11月12日(木) 15:00-16:30 天文台輪講室
 . [[attachment:LCGT/subgroup/vis/Modeling6.ppt|Model vs. Measurement in TAMA-SAS]]
 . [[attachment:LCGT/subgroup/vis/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]]
== Instruments ==
Line 53: Line 24:
=== 第5回 ===
 . 10月15日(木) 13:00-14:30 天文台大会議室 ([[attachment:LCGT/subgroup/vis/minutes5.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling5.ppt|LCGT-SAS Modeling 5 (Type-B,C)]]
 . [[attachment:LCGT/subgroup/vis/chamber-A.pdf|Design of Type-A chamber]]
=== Suspension types ===
[[KAGRA/Subgroups/VIS/TypeA|Type-A]]
Line 58: Line 27:
=== ブレーンストーミング ===
 . 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 ([[attachment:LCGT/subgroup/vis/minutes-b.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/brest.pdf|メモ]]
[[KAGRA/Subgroups/VIS/TypeB|Type-B]]
Line 62: Line 29:
=== 第4回 ===
 . 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes4.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]]
 . [[attachment:LCGT/subgroup/vis/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]]
 . [[attachment:LCGT/subgroup/vis/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]])
[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]
Line 68: Line 31:
=== 第3回 ===
 . 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes3.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling2.ppt|LCGT-SAS Modeling 2]]
 . [[attachment:LCGT/subgroup/vis/RandD2.pdf|低温懸架のR&Dについて]]
[[KAGRA/Subgroups/VIS/Type-C|Type-C]]
Line 73: Line 33:
=== 第2回 ===
 . 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes2.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]]
 . [[attachment:LCGT/subgroup/vis/RandD.pdf|LCGT-SASのR&Dについて]]
[[KAGRA/Subgroups/VIS/Payload|Payload]]
Line 78: Line 35:
=== 第1回 ===
 . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes1.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]]
 . [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]])
 . [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]]
 . R&Dについて (次回)
[[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]

[[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]]

=== Suspended optics ===

 * Arm cavity
  * ETMX
  * ETMY
  * ITMX
  * ITMY
 * Beam splitter (BS)
 * Signal recycling cavity
  * SRM
  * SR2
  * SR3
 * Power recycling cavity
  * PRM
  * PR2
  * PR3
 * Input optics
  * IMC
  * IMMT1
  * IMMT2
 * Output optics
  * OMMT1
  * OMMT2
  * OSTM
  * OMC
 * Auxiliary optics
  * TMSX
  * TMSY
Line 86: Line 69:
== Archive == == Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]
Line 88: Line 73:
=== TAMA SAS ===
 . [[attachment:LCGT/subgroup/vis/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]]
 . [[attachment:tama_sas.pdf|Drawings of TAMA SAS]]
 . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]]
 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Real Time Model Development ==
 . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]]
----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]
Line 93: Line 81:
=== TAMA Double Pendulum ===
 . [[LCGT/subgroup/vis/tama_double|Item list to be improved]]
----
== VIS Introductioon ==
 . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]]
Line 96: Line 85:
=== Seismic spectrum in Kamioka mine ===
 . [[attachment:LCGT/subgroup/ifo/SPI/HeatLink/0702seis_Araya.zip|In loud day]] (This data should be used as nominal ground motion in Kamioka)
 . [[attachment:CLIO/NoiseBudgets/seismic/cryo_seismic.txt|In cryostat]]
Line 100: Line 86:
=== LCGT-SAS model ===
 . Transfer function X0~X7/Xg --([[attachment:LCGT/subgroup/vis/model_trf.txt|(old)]])--
 . Modeling M-file --([[attachment:LCGT/subgroup/vis/model_mfile.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_mfile2.zip|(2009/8/17)]]
 . Spectrum of displacement --([[attachment:LCGT/subgroup/vis/model_disp.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_disp2.zip|(2009/8/17)]]
----
== VIS Commissioning ==
 . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]]
Line 105: Line 90:
=== Finite Element Analysis ===
 . [[LCGT/subgroup/vis/FEM|FEM Page]]
Line 108: Line 91:
=== Rigid-Body Models ===
 . [[LCGT/subgroup/vis/Simulation|Simulation Page]]

----
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]

----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.

[[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]

== Members ==

 * Chief: R. Takahashi
 * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


<<Navigation(children)>>

VIS

Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer.

Space for VIS-internal use

Quick announcement

  • VIS meeting: From 14:00 (JST) on every Friday - Meeting Page


VIS Upgrades

Upgrade Page


Instruments

Suspension types

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs

Suspended optics

  • Arm cavity
    • ETMX
    • ETMY
    • ITMX
    • ITMY
  • Beam splitter (BS)
  • Signal recycling cavity
    • SRM
    • SR2
    • SR3
  • Power recycling cavity
    • PRM
    • PR2
    • PR3
  • Input optics
    • IMC
    • IMMT1
    • IMMT2
  • Output optics
    • OMMT1
    • OMMT2
    • OSTM
    • OMC
  • Auxiliary optics
    • TMSX
    • TMSY


Installation


Real Time Model Development


Operation


VIS Introductioon


VIS Commissioning


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

Members

  • Chief: R. Takahashi
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)