= VIS =

'''V'''ibration '''I'''solation '''S'''ystem is the infrastructure for the main optics in the KAGRA interferometer.
Line 6: Line 11:
 . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),  . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
Line 15: Line 20:
== VIS Upgrades ==

[[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]]

----
Line 18: Line 28:
Type-B [[KAGRA/Subgroups/VIS/TypeB|Type-B]]
Line 22: Line 32:
Type-C [[KAGRA/Subgroups/VIS/Type-C|Type-C]]
Line 26: Line 36:
iKAGRA TM [[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]

[[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]]
Line 33: Line 45:
 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Real Time Model Development ==
 . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]]
Line 36: Line 52:

----
== VIS Introductioon ==
 . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]]


----
== VIS Commissioning ==
 . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]]



----
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]
Line 42: Line 73:

<<Navigation(children)>>

VIS

Vibration Isolation System is the infrastructure for the main optics in the KAGRA interferometer.

Vibration Isolation

  • Chief: R. Takahashi (NAOJ)
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


VIS Meeting


VIS Upgrades

Upgrade Page


Design

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs


Installation


Real Time Model Development


Operation


VIS Introductioon


VIS Commissioning


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)