'''防振''' ## page was renamed from LCGT/subgroup/vis
Line 3: Line 3:
リーダー: 高橋竜太郎 (NAOJ) = VIS =
Line 5: Line 5:
サブリーダー:内山隆 (ICRR)、三代木伸二 (ICRR) '''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer.
Line 7: Line 7:
*[[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] <<TableOfContents(3)>>

== Space for VIS-internal Use ==

=== Quick Announcement ===

=== Frequently Used Links ===
 * VIS meeting: From 14:00 (JST) on every Friday [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]

----
== VIS Upgrades ==

[[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]]

----
== Design ==
[[KAGRA/Subgroups/VIS/TypeA|Type-A]]

[[KAGRA/Subgroups/VIS/TypeB|Type-B]]

[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]

[[KAGRA/Subgroups/VIS/Type-C|Type-C]]

[[KAGRA/Subgroups/VIS/Payload|Payload]]

[[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]

[[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]]

----
== Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]

 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Real Time Model Development ==
 . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]]
----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]

----
== VIS Introductioon ==
 . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]]


----
== VIS Commissioning ==
 . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]]



----
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]

----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.

[[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]

== Members ==

 * Chief: R. Takahashi
 * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


<<Navigation(children)>>

VIS

Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer.

Space for VIS-internal Use

Quick Announcement


VIS Upgrades

Upgrade Page


Design

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs


Installation


Real Time Model Development


Operation


VIS Introductioon


VIS Commissioning


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

Members

  • Chief: R. Takahashi
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)