5708
Comment:
|
5474
|
Deletions are marked like this. | Additions are marked like this. |
Line 21: | Line 21: |
1. ~+Construction of 2 fixed-mirror interferometers along KAGRA, for both __'''geophysical observation'''__ and __'''KAGRA baseline monitor'''__.+~ 2. ~+Arrangement of __'''environment sensors'''__ for monitoring the tunnel, rooms, and instruments.+~ |
1. xxxxx 2. yyyyy |
Vibration Isolation System (VIS)
Meetings |
Management |
User topics |
Developer topics |
|
|
|
Suspensions |
Mechanics |
Sensors |
Actuators/Motors |
Other subsystem interfaces |
Control |
Apps |
Links |
Solenoid actuator? |
- |
||||||
- |
- |
- |
|
||||
└ BF LVDT |
- |
- |
- |
|
|||
- |
- |
- |
|
||||
- |
- |
- |
|
||||
--- |
- |
- |
- |
- |
|
Definition and scope
- xxxxx
2. yyyyy
Instruments
Suspension types
Real-time front-end model
See also: Real-time model development
Apps
Installation
Real Time Model Development
Operation
VIS Introductioon
VIS Commissioning
Archives
Old Weekly EVO Meeting
- This meeting is suspended.
Subgroup
Members
- Chief: R. Takahashi
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
Communication info
- Mailing list: [kagra-seis]