Differences between revisions 33 and 255 (spanning 222 versions)
Revision 33 as of 2009-07-15 15:52:09
Size: 1275
Comment:
Revision 255 as of 2020-03-11 13:47:05
Size: 4675
Editor: KokiOkutomi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
||'''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || ## page was renamed from LCGT/subgroup/vis

= VIS =

'''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer.
The VIS subgroup works for ...

||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Meetings'''||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Management'''||<#1e50a2 style="color:#ffffff; text-align:center;"> '''For users'''||<#1e50a2 style="color:#ffffff; text-align:center;"> '''For developpers''' ||
||[[KAGRA/Subgroups/VIS/MeetingNAOJ|Weekly VIS Meeting]] || [[KAGRA/Subgroups/VIS/Schedule|Schedule]] || || ||
||[[KAGRA/Subgroups/VIS/ExtraMeetings|Extraordinary Meetings]] || || || ||

||<#1e50a2 |2 style="color:#ffffff; text-align:center;"> '''Tall suspensions''' ||<:-4 style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/TypeA|Type-A]] ||<:-4 style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/TypeB|Type-B]] ||<:-3 style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] ||
|| [[KAGRA/Subgroups/VIS/Optics/ETMX|ETMX]] || [[KAGRA/Subgroups/VIS/Optics/ETMY|ETMY]] || [[KAGRA/Subgroups/VIS/Optics/ITMX|ITMX]] || [[KAGRA/Subgroups/VIS/Optics/ITMY|ITMY]] || [[KAGRA/Subgroups/VIS/Optics/BS|BS]] || [[KAGRA/Subgroups/VIS/Optics/SRM|SRM]] || [[KAGRA/Subgroups/VIS/Optics/SR2|SR2]] ||[[KAGRA/Subgroups/VIS/Optics/SR3|SR3]] || [[KAGRA/Subgroups/VIS/Optics/PRM|PRM]] || [[KAGRA/Subgroups/VIS/Optics/PR2|PR2]] || [[KAGRA/Subgroups/VIS/Optics/PR3|PR3]] ||
||<:-11> ||
||<#1e50a2 |2 style="color:#ffffff; text-align:center;"> '''Short suspensions''' ||<:-8 style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/Type-C|Type-C]]||<:-2 style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/TMS-VIS|TMS-VIS]] ||
|| [[KAGRA/Subgroups/VIS/Optics/MCE|MCE]] || [[KAGRA/Subgroups/VIS/Optics/MCI|MCI]] || [[KAGRA/Subgroups/VIS/Optics/MCO|MCO]] || [[KAGRA/Subgroups/VIS/Optics/IMMT1|IMMT1]] || [[KAGRA/Subgroups/VIS/Optics/IMMT2|IMMT2]] || [[KAGRA/Subgroups/VIS/Optics/OMMT1|OMMT1]] || [[KAGRA/Subgroups/VIS/Optics/OMMT2|OMMT2]] || [[KAGRA/Subgroups/VIS/Optics/OSTM|OSTM]] || [[KAGRA/Subgroups/VIS/Optics/TMSX|TMSX]] || [[KAGRA/Subgroups/VIS/Optics/TMSY|TMSY]] ||

||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Mechanics''' ||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Sensors''' ||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Actuators/Motors''' ||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Other subsystem interfaces''' ||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Apps''' ||
|| [[KAGRA/Subgroups/VIS/Mechanics/Pre-Isolator|Pre-Isolator]] || [[KAGRA/Subgroups/VIS/Sensors/LVDT|LVDT]] || [[KAGRA/Subgroups/VIS/Actuators/VoiceCoilActuator|Voice Coil Actuator]] || [[KAGRA/Subgroups/VIS/AELInterfaces|AEL interfaces]] || ||

----
== VIS Upgrades ==

[[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]]

----
== Instruments ==

=== Suspension types ===

[[KAGRA/Subgroups/VIS/TypeA|Type-A]]

[[KAGRA/Subgroups/VIS/TypeB|Type-B]]

[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]

[[KAGRA/Subgroups/VIS/Type-C|Type-C]]

[[KAGRA/Subgroups/VIS/Payload|Payload]]

[[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]

[[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]]
Line 4: Line 46:
<<TableOfContents(3)>> === Real-time front-end model ===
 . ''See also:'' [[KAGRA/Subgroups/VIS|Real-time model development]]
Line 6: Line 49:
== 防振系 ==
 . 常温防振+ヒートリンク+低温懸架
 . リーダー: 高橋竜太郎 (NAOJ)
 . サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR)
Line 11: Line 50:
=== 第2回LCGT防振系作業部会 ===
 . 7月16日(水) 15:00-16:30 天文台輪講室
 [[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]]
 . [[attachment:LCGT/subgroup/vis/RandD.pdf|R&Dについて]]
----
== Apps ==
Line 16: Line 53:
=== 第1回LCGT防振系作業部会 ===
 . 6月3日(水) 17:00-19:00 天文台輪講室
 [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]]
 . [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]])
 . [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]]
 . R&Dについて (次回)
Line 23: Line 54:
=== TAMA SAS の問題点 ===
 . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]]
----
== Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]
Line 26: Line 59:
=== TAMA Double Pendulum の問題点 ===
 . [[LCGT/subgroup/vis/tama_double|Item list to be improved]]
 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Real Time Model Development ==
 . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]]
----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]

----
== VIS Introductioon ==
 . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]]


----
== VIS Commissioning ==
 . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]]



----
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]

----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.

[[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]

== Subgroup ==

=== Members ===

 * Chief: R. Takahashi
 * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)

=== Communication info ===

 * Mailing list: [kagra-seis]

<<Navigation(children)>>

VIS

Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer. The VIS subgroup works for ...

Meetings

Management

For users

For developpers

Weekly VIS Meeting

Schedule

Extraordinary Meetings

Tall suspensions

Type-A

Type-B

Type-Bp

ETMX

ETMY

ITMX

ITMY

BS

SRM

SR2

SR3

PRM

PR2

PR3

Short suspensions

Type-C

TMS-VIS

MCE

MCI

MCO

IMMT1

IMMT2

OMMT1

OMMT2

OSTM

TMSX

TMSY

Mechanics

Sensors

Actuators/Motors

Other subsystem interfaces

Apps

Pre-Isolator

LVDT

Voice Coil Actuator

AEL interfaces


VIS Upgrades

Upgrade Page


Instruments

Suspension types

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs

Real-time front-end model


Apps


Installation


Real Time Model Development


Operation


VIS Introductioon


VIS Commissioning


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

Subgroup

Members

  • Chief: R. Takahashi
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)

Communication info

  • Mailing list: [kagra-seis]

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)