Differences between revisions 57 and 194 (spanning 137 versions)
Revision 57 as of 2009-09-30 14:46:56
Size: 2858
Comment:
Revision 194 as of 2020-02-28 11:55:22
Size: 2462
Editor: KokiOkutomi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
||'''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || ## page was renamed from LCGT/subgroup/vis
Line 3: Line 3:
= VIS =

'''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer.
Line 6: Line 9:
== 防振系 ==
 . 常温防振+ヒートリンク+低温懸架
 . リーダー: 高橋竜太郎 (NAOJ)
 . サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR)
== Space for VIS-internal use ==
Line 11: Line 11:
=== 第4回LCGT防振系作業部会 ===
 . 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes4.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]]
 . [[attachment:LCGT/subgroup/vis/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]]
 . [[attachment:LCGT/subgroup/vis/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]])
=== Quick announcement ===
Line 17: Line 13:
=== 第3回LCGT防振系作業部会 ===
 . 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes3.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling2.ppt|LCGT-SAS Modeling 2]]
 . [[attachment:LCGT/subgroup/vis/RandD2.pdf|低温懸架のR&Dについて]]
=== Frequently used links ===
 * '''VIS meeting''': From 14:00 (JST) on every Friday - [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]
Line 22: Line 16:
=== 第2回LCGT防振系作業部会 ===
 . 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes2.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]]
 . [[attachment:LCGT/subgroup/vis/RandD.pdf|LCGT-SASのR&Dについて]]
----
== VIS Upgrades ==
Line 27: Line 19:
=== 第1回LCGT防振系作業部会 ===
 . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes1.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]]
 . [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]])
 . [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]]
 . R&Dについて (次回)
[[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]]
Line 34: Line 21:
=== TAMA SAS の問題点 ===
 . [[attachment:tama_sas.pdf|Drawings of TAMA SAS]]
 . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]]
----
== Instruments ==
Line 38: Line 24:
=== TAMA Double Pendulum の問題点 ===
 . [[LCGT/subgroup/vis/tama_double|Item list to be improved]]
=== Suspension types ===
[[KAGRA/Subgroups/VIS/TypeA|Type-A]]
Line 41: Line 27:
=== Seismic spectrum in Kamioka mine ===
 . [[attachment:LCGT/subgroup/ifo/SPI/HeatLink/0702seis_Araya.zip|In loud day]] (This data should be used as nominal ground motion in Kamioka)
 . [[attachment:CLIO/NoiseBudgets/seismic/cryo_seismic.txt|In cryostat]]
[[KAGRA/Subgroups/VIS/TypeB|Type-B]]
Line 45: Line 29:
=== LCGT-SAS model ===
 . Transfer function X0~X7/Xg --([[attachment:LCGT/subgroup/vis/model_trf.txt|(old)]])--
 . Modeling M-file --([[attachment:LCGT/subgroup/vis/model_mfile.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_mfile2.zip|(2009/8/17)]]
 . Spectrum of displacement --([[attachment:LCGT/subgroup/vis/model_disp.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_disp2.zip|(2009/8/17)]]
[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]

[[KAGRA/Subgroups/VIS/Type-C|Type-C]]

[[KAGRA/Subgroups/VIS/Payload|Payload]]

[[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]

[[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]]

=== Suspended optics ===

 * Arm cavity
  * ETMX
  * ETMY
  * ITMX
  * ITMY
 * Beam splitter (BS)
 * Signal recycling cavity
  * SRM
  * SR2
  * SR3
 * Power recycling cavity
  * PRM
  * PR2
  * PR3
 * Input optics
  * IMC
  * IMMT1
  * IMMT2
 * Output optics
  * OMMT1
  * OMMT2
  * OSTM
  * OMC
 * Auxiliary optics
  * TMSX
  * TMSY

----
== Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]

 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Real Time Model Development ==
 . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]]
----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]

----
== VIS Introductioon ==
 . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]]


----
== VIS Commissioning ==
 . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]]



----
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]

----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.

[[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]

== Members ==

 * Chief: R. Takahashi
 * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


<<Navigation(children)>>

VIS

Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer.

Space for VIS-internal use

Quick announcement

  • VIS meeting: From 14:00 (JST) on every Friday - Meeting Page


VIS Upgrades

Upgrade Page


Instruments

Suspension types

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs

Suspended optics

  • Arm cavity
    • ETMX
    • ETMY
    • ITMX
    • ITMY
  • Beam splitter (BS)
  • Signal recycling cavity
    • SRM
    • SR2
    • SR3
  • Power recycling cavity
    • PRM
    • PR2
    • PR3
  • Input optics
    • IMC
    • IMMT1
    • IMMT2
  • Output optics
    • OMMT1
    • OMMT2
    • OSTM
    • OMC
  • Auxiliary optics
    • TMSX
    • TMSY


Installation


Real Time Model Development


Operation


VIS Introductioon


VIS Commissioning


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

Members

  • Chief: R. Takahashi
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)