||'''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || ## page was renamed from LCGT/subgroup/vis
Line 3: Line 3:
= VIS =

'''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer.
Line 6: Line 9:
== 防振系 ==
 . 常温防振+ヒートリンク+低温懸架
 . リーダー: 高橋竜太郎 (NAOJ)
 . サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR)
== Space for VIS-internal Use ==
Line 11: Line 11:
=== LCGT防振系作業部会ブレーンストーミング ===
 . 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室
=== Quick Announcement ===
Line 14: Line 13:
=== 第4回LCGT防振系作業部会 ===
 . 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes4.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]]
 . [[attachment:LCGT/subgroup/vis/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]]
 . [[attachment:LCGT/subgroup/vis/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]])
=== Frequently Used Links ===
 * '''VIS meeting''': From 14:00 (JST) on every Friday - [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]
Line 20: Line 16:
=== 第3回LCGT防振系作業部会 ===
 . 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes3.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling2.ppt|LCGT-SAS Modeling 2]]
 . [[attachment:LCGT/subgroup/vis/RandD2.pdf|低温懸架のR&Dについて]]
----
== VIS Upgrades ==
Line 25: Line 19:
=== 第2回LCGT防振系作業部会 ===
 . 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes2.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]]
 . [[attachment:LCGT/subgroup/vis/RandD.pdf|LCGT-SASのR&Dについて]]
[[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]]
Line 30: Line 21:
=== 第1回LCGT防振系作業部会 ===
 . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes1.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]]
 . [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]])
 . [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]]
 . R&Dについて (次回)
----
== Design ==
[[KAGRA/Subgroups/VIS/TypeA|Type-A]]
Line 37: Line 25:
=== TAMA SAS の問題点 ===
 . [[attachment:tama_sas.pdf|Drawings of TAMA SAS]]
 . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]]
[[KAGRA/Subgroups/VIS/TypeB|Type-B]]
Line 41: Line 27:
=== TAMA Double Pendulum の問題点 ===
 . [[LCGT/subgroup/vis/tama_double|Item list to be improved]]
[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]
Line 44: Line 29:
=== Seismic spectrum in Kamioka mine ===
 . [[attachment:LCGT/subgroup/ifo/SPI/HeatLink/0702seis_Araya.zip|In loud day]] (This data should be used as nominal ground motion in Kamioka)
 . [[attachment:CLIO/NoiseBudgets/seismic/cryo_seismic.txt|In cryostat]]
[[KAGRA/Subgroups/VIS/Type-C|Type-C]]
Line 48: Line 31:
=== LCGT-SAS model ===
 . Transfer function X0~X7/Xg --([[attachment:LCGT/subgroup/vis/model_trf.txt|(old)]])--
 . Modeling M-file --([[attachment:LCGT/subgroup/vis/model_mfile.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_mfile2.zip|(2009/8/17)]]
 . Spectrum of displacement --([[attachment:LCGT/subgroup/vis/model_disp.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_disp2.zip|(2009/8/17)]]
[[KAGRA/Subgroups/VIS/Payload|Payload]]

[[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]

[[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]]

----
== Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]

 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Real Time Model Development ==
 . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]]
----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]

----
== VIS Introductioon ==
 . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]]


----
== VIS Commissioning ==
 . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]]



----
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]

----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.

[[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]

== Members ==

 * Chief: R. Takahashi
 * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


<<Navigation(children)>>

VIS

Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer.

Space for VIS-internal Use

Quick Announcement

  • VIS meeting: From 14:00 (JST) on every Friday - Meeting Page


VIS Upgrades

Upgrade Page


Design

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs


Installation


Real Time Model Development


Operation


VIS Introductioon


VIS Commissioning


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

Members

  • Chief: R. Takahashi
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)