||'''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || | ## page was renamed from LCGT/subgroup/vis |
Line 3: | Line 3: |
= VIS = '''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer. |
|
Line 6: | Line 9: |
== Vibration Isolation == . Chief: R. Takahashi(ICRR) . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR) |
== Space for VIS-internal use == === Quick announcement === === Frequently used links === * '''VIS meeting''': From 14:00 (JST) on every Friday - [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] |
Line 11: | Line 17: |
== Weekly EVO Meeting == . Every Wednesday, 21:00(JST) |
== VIS Upgrades == |
Line 14: | Line 19: |
=== The 20th (24 August, 2011) === === The 19th (10 August, 2011) === === The 18th (27 July, 2011) === . [[attachment:LCGT/subgroup/vis/PayloadB_0727.pdf|Design of Type-B payload by Riccardo]] === The 17th (20 July, 2011) === === The 16th (13 July, 2011) === . [[attachment:LCGT/subgroup/vis/SR2-PR2_0711.pdf|SR2-PR2 recoil mass by Riccardo]] . [[attachment:LCGT/subgroup/vis/angle_0713.pdf|Angular fluctuation of TM by Takanori]] === The 15th (6 July, 2011) === . [[attachment:LCGT/subgroup/vis/2type_0701.pdf|Type-B payload model by Sekiguchi]] === The 14th (29 June, 2011) === . [[attachment:LCGT/subgroup/vis/kapton_0627.pdf|Kapton Wire by Sekiguchi]] === The 13th (22 June, 2011) === . [[http://tamago.mtk.nao.ac.jp/ishizaki/LCGT/kaptonwire/cable.pdf|Kapton Wire by Ishizaki]] === The 12th (15 June, 2011) === === The 11th (8 June, 2011) === . [[attachment:LCGT/subgroup/vis/minute0608.pdf|Minute]] === The 10th (1 June, 2011) === . [[attachment:LCGT/subgroup/vis/damping0601.pdf|Mode damping study by Takanori]] === The 9th (25 May, 2011) === === The 8th (18 May, 2011) === . [[attachment:LCGT/subgroup/vis/magicwand.png|Magic wands by Takanori]] . [[attachment:LCGT/subgroup/vis/Check110512.pdf|Heavier test mass by Ettore and Takanori]] === The 7th (11 May, 2011) === . [[attachment:LCGT/subgroup/vis/rep110511.pdf|Report by Takanori]] === The 6th (27 April, 2011) === . [[attachment:LCGT/subgroup/vis/dimension110427.docx|Payload dimensions by Riccardo]] === The 5th (20 April, 2011) === . [[attachment:LCGT/subgroup/vis/3D_model.pdf|Parameter Configuration by Ettore]] === (11 April, 2011) === . [[attachment:LCGT/subgroup/vis/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]] === The 4th (6 April, 2011) === . [[attachment:LCGT/subgroup/vis/10-30_April06.docx|Simulation by Ettore]] . [[attachment:LCGT/subgroup/vis/sequence110406.pdf|Installation sequence by Riccardo]] === The 3rd (30 March, 2011) === . [[attachment:LCGT/subgroup/vis/coordinate110330.pdf|Coordinate system by Ryutaro]] . [[attachment:LCGT/subgroup/vis/110330_isasA.pdf|Simulation by Takanori]] === The 2nd (23 March, 2011) === . [[attachment:LCGT/subgroup/vis/memo110323.txt|Comments by Riccardo]] . [[attachment:LCGT/subgroup/vis/report110323.doc|Status report by Riccardo]] . [[attachment:LCGT/subgroup/vis/sim110323.pptx|Simulation by Ettore]] === The 1st (16 March, 2011) === . [[attachment:LCGT/subgroup/vis/Tower-a.pdf|Design for Type-A system]] . [[attachment:LCGT/subgroup/vis/filter-chain.pdf|Detail of filter's chain]] |
[[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]] |
Line 80: | Line 22: |
== LCGT防振系作業部会(2009) == === 第6回 === . 11月12日(木) 15:00-16:30 天文台輪講室 . [[attachment:LCGT/subgroup/vis/Modeling6.ppt|Model vs. Measurement in TAMA-SAS]] . [[attachment:LCGT/subgroup/vis/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]] |
== Instruments == |
Line 86: | Line 24: |
=== 第5回 === . 10月15日(木) 13:00-14:30 天文台大会議室 ([[attachment:LCGT/subgroup/vis/minutes5.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/Modeling5.ppt|LCGT-SAS Modeling 5 (Type-B,C)]] . [[attachment:LCGT/subgroup/vis/chamber-A.pdf|Design of Type-A chamber]] |
=== Suspension types === [[KAGRA/Subgroups/VIS/TypeA|Type-A]] |
Line 91: | Line 27: |
=== ブレーンストーミング === . 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 ([[attachment:LCGT/subgroup/vis/minutes-b.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/brest.pdf|メモ]] |
[[KAGRA/Subgroups/VIS/TypeB|Type-B]] |
Line 95: | Line 29: |
=== 第4回 === . 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes4.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]] . [[attachment:LCGT/subgroup/vis/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]] . [[attachment:LCGT/subgroup/vis/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]]) |
[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] |
Line 101: | Line 31: |
=== 第3回 === . 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes3.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/Modeling2.ppt|LCGT-SAS Modeling 2]] . [[attachment:LCGT/subgroup/vis/RandD2.pdf|低温懸架のR&Dについて]] |
[[KAGRA/Subgroups/VIS/Type-C|Type-C]] |
Line 106: | Line 33: |
=== 第2回 === . 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes2.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]] . [[attachment:LCGT/subgroup/vis/RandD.pdf|LCGT-SASのR&Dについて]] |
[[KAGRA/Subgroups/VIS/Payload|Payload]] |
Line 111: | Line 35: |
=== 第1回 === . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes1.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]] . [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]]) . [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]] . R&Dについて (次回) |
[[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]] [[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]] === Suspended optics === The optics in the KAGRA interferometer are often called their acronyms/abbreviations<<FootNote(Please mind also that we call the vacuum chambers or clean booths in a similar manner.)>> listed below. The linked pages from the optics' names show the specification of each component of the suspension systems. * Arm cavity * ETMX * ETMY * ITMX * ITMY * Beam splitter (BS) * Signal recycling cavity * SRM * SR2 * SR3 * Power recycling cavity * PRM * PR2 * PR3 * Input optics * IMC * IMMT1 * IMMT2 * Output optics * OMMT1 * OMMT2 * OSTM * OMC * Auxiliary optics * TMSX * TMSY === Mechanics === ==== Tower ==== * Pre-isolator * Inverted Pendulum (IP) * Top GAS Filter (TF<<FootNote(This abbreviation should be avoided because it often refers to rather ''transfer function''.)>>) * Standard GAS Filter (SF) * Bottom GAS Filter (BF) * Magnetic damper ==== Payload ==== * Cryogenic payload (CRYp): The bottom 4 stages in Type-A suspension, branch recoil-mass chain * Platform (PF) * Marionette (MN) * Intermediate Mass (IM) * Test Mass (TM) * Room-temperature payload: The bottom 2 stages in Type-B and Type-Bp suspension, parallel recoil-mass chain * Intermediate Mass (IM) * Test Mass (TM) === Electronics === A list of local sensors, actuators, and motors equipped by the suspension systems. * '''LVDT''' - Linear Variable Differential Transducer/Transformer, displacement sensor * [''Derivative''] Bottom-filter LVDT (BF LVDT) * '''Geophone''' - inertial velocity sensor * '''Accelerometer''' - * '''OSEM''' - Optical Sensor and Electromagnet * '''Optical Lever''' * '''Fishing rod''' * Picomotor * |
Line 119: | Line 106: |
== Archive == | == Integration with digital system == |
Line 121: | Line 108: |
=== TAMA SAS === . [[attachment:LCGT/subgroup/vis/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]] . [[attachment:tama_sas.pdf|Drawings of TAMA SAS]] . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]] |
. ''See also:'' |
Line 126: | Line 110: |
=== TAMA Double Pendulum === . [[LCGT/subgroup/vis/tama_double|Item list to be improved]] |
All the sensor readouts, actuation signals, and motor operation commands are governed with KAGRA digital signal processing system provided by DGS subsystem. |
Line 129: | Line 112: |
=== Seismic spectrum in Kamioka mine === . [[attachment:LCGT/subgroup/ifo/SPI/HeatLink/0702seis_Araya.zip|In loud day]] (This data should be used as nominal ground motion in Kamioka) . [[attachment:CLIO/NoiseBudgets/seismic/cryo_seismic.txt|In cryostat]] |
---- == Installation == . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]] . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]] |
Line 133: | Line 117: |
=== LCGT-SAS model === . Transfer function X0~X7/Xg --([[attachment:LCGT/subgroup/vis/model_trf.txt|(old)]])-- . Modeling M-file --([[attachment:LCGT/subgroup/vis/model_mfile.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_mfile2.zip|(2009/8/17)]] . Spectrum of displacement --([[attachment:LCGT/subgroup/vis/model_disp.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_disp2.zip|(2009/8/17)]] |
. [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]] ---- == Real Time Model Development == . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]] ---- == Operation == . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]] |
Line 138: | Line 125: |
=== Finite Element Analysis === . [[LCGT/subgroup/vis/FEM|FEM Page]] |
---- == VIS Introductioon == . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]] |
Line 141: | Line 129: |
=== Rigid-Body Models === . [[LCGT/subgroup/vis/Simulation|Simulation Page]] |
---- == VIS Commissioning == . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]] ---- == Archives == . [[KAGRA/Subgroups/VIS/Photos|Photos]] ---- == Old Weekly EVO Meeting == . This meeting is suspended. [[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]] == Subgroup == === Members === * Chief: R. Takahashi * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) === Communication info === * Mailing list: [kagra-seis] <<Navigation(children)>> |
VIS
Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer.
Contents
Space for VIS-internal use
Quick announcement
Frequently used links
VIS meeting: From 14:00 (JST) on every Friday - Meeting Page
VIS Upgrades
Instruments
Suspension types
Suspended optics
The optics in the KAGRA interferometer are often called their acronyms/abbreviations1 listed below. The linked pages from the optics' names show the specification of each component of the suspension systems.
- Arm cavity
- ETMX
- ETMY
- ITMX
- ITMY
- Beam splitter (BS)
- Signal recycling cavity
- SRM
- SR2
- SR3
- Power recycling cavity
- PRM
- PR2
- PR3
- Input optics
- IMC
- IMMT1
- IMMT2
- Output optics
- OMMT1
- OMMT2
- OSTM
- OMC
- Auxiliary optics
- TMSX
- TMSY
Mechanics
Tower
- Pre-isolator
- Inverted Pendulum (IP)
Top GAS Filter (TF2)
- Standard GAS Filter (SF)
- Bottom GAS Filter (BF)
- Magnetic damper
Payload
- Cryogenic payload (CRYp): The bottom 4 stages in Type-A suspension, branch recoil-mass chain
- Platform (PF)
- Marionette (MN)
- Intermediate Mass (IM)
- Test Mass (TM)
- Room-temperature payload: The bottom 2 stages in Type-B and Type-Bp suspension, parallel recoil-mass chain
- Intermediate Mass (IM)
- Test Mass (TM)
Electronics
A list of local sensors, actuators, and motors equipped by the suspension systems.
LVDT - Linear Variable Differential Transducer/Transformer, displacement sensor
[Derivative] Bottom-filter LVDT (BF LVDT)
Geophone - inertial velocity sensor
Accelerometer -
OSEM - Optical Sensor and Electromagnet
Optical Lever
Fishing rod
- Picomotor
Integration with digital system
See also:
All the sensor readouts, actuation signals, and motor operation commands are governed with KAGRA digital signal processing system provided by DGS subsystem.
Installation
Real Time Model Development
Operation
VIS Introductioon
VIS Commissioning
Archives
Old Weekly EVO Meeting
- This meeting is suspended.
Subgroup
Members
- Chief: R. Takahashi
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
Communication info
- Mailing list: [kagra-seis]