||'''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || ## page was renamed from LCGT/subgroup/vis
Line 3: Line 3:
= VIS =

'''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer.
Line 6: Line 9:
== Vibration Isolation ==
 . Chief: R. Takahashi(ICRR)
 . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)
== Space for VIS-internal use ==

=== Quick announcement ===

=== Frequently used links ===
 * '''VIS meeting''': From 14:00 (JST) on every Friday - [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]
Line 11: Line 17:
== Weekly EVO Meeting ==
 . Every Wednesday, 21:00(JST)
== VIS Upgrades ==
Line 14: Line 19:
=== The 23th (15 September, 2011) ===

=== The 22th (7 September, 2011) ===
 . [[attachment:LCGT/subgroup/vis/Type-B_system_rycy.pdf|Z-Assembly for RM by Riccardo]]
 . [[attachment:LCGT/subgroup/vis/Type-B_system_bs.pdf|Z-Assembly for BS by Riccardo]]
 . [[attachment:LCGT/subgroup/vis/TypeB_sim_0907.pdf|Simulation on TypeB by Takanori]]

=== The 21th (31 August, 2011) ===

=== The 20th (24 August, 2011) ===

=== The 19th (10 August, 2011) ===

=== The 18th (27 July, 2011) ===
 . [[attachment:LCGT/subgroup/vis/PayloadB_0727.pdf|Design of Type-B payload by Riccardo]]

=== The 17th (20 July, 2011) ===

=== The 16th (13 July, 2011) ===
 . [[attachment:LCGT/subgroup/vis/SR2-PR2_0711.pdf|SR2-PR2 recoil mass by Riccardo]]
 . [[attachment:LCGT/subgroup/vis/angle_0713.pdf|Angular fluctuation of TM by Takanori]]

=== The 15th (6 July, 2011) ===
 . [[attachment:LCGT/subgroup/vis/2type_0701.pdf|Type-B payload model by Sekiguchi]]

=== The 14th (29 June, 2011) ===
 . [[attachment:LCGT/subgroup/vis/kapton_0627.pdf|Kapton Wire by Sekiguchi]]

=== The 13th (22 June, 2011) ===
 . [[http://tamago.mtk.nao.ac.jp/ishizaki/LCGT/kaptonwire/cable.pdf|Kapton Wire by Ishizaki]]

=== The 12th (15 June, 2011) ===

=== The 11th (8 June, 2011) ===
 . [[attachment:LCGT/subgroup/vis/minute0608.pdf|Minute]]

=== The 10th (1 June, 2011) ===
 . [[attachment:LCGT/subgroup/vis/damping0601.pdf|Mode damping study by Takanori]]

=== The 9th (25 May, 2011) ===

=== The 8th (18 May, 2011) ===
 . [[attachment:LCGT/subgroup/vis/magicwand.png|Magic wands by Takanori]]
 . [[attachment:LCGT/subgroup/vis/Check110512.pdf|Heavier test mass by Ettore and Takanori]]

=== The 7th (11 May, 2011) ===
 . [[attachment:LCGT/subgroup/vis/rep110511.pdf|Report by Takanori]]

=== The 6th (27 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/dimension110427.docx|Payload dimensions by Riccardo]]

=== The 5th (20 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/3D_model.pdf|Parameter Configuration by Ettore]]

=== (11 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]]

=== The 4th (6 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/10-30_April06.docx|Simulation by Ettore]]
 . [[attachment:LCGT/subgroup/vis/sequence110406.pdf|Installation sequence by Riccardo]]

=== The 3rd (30 March, 2011) ===
 . [[attachment:LCGT/subgroup/vis/coordinate110330.pdf|Coordinate system by Ryutaro]]
 . [[attachment:LCGT/subgroup/vis/110330_isasA.pdf|Simulation by Takanori]]

=== The 2nd (23 March, 2011) ===
 . [[attachment:LCGT/subgroup/vis/memo110323.txt|Comments by Riccardo]]
 . [[attachment:LCGT/subgroup/vis/report110323.doc|Status report by Riccardo]]
 . [[attachment:LCGT/subgroup/vis/sim110323.pptx|Simulation by Ettore]]

=== The 1st (16 March, 2011) ===
 . [[attachment:LCGT/subgroup/vis/Tower-a.pdf|Design for Type-A system]]
 . [[attachment:LCGT/subgroup/vis/filter-chain.pdf|Detail of filter's chain]]
[[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]]
Line 89: Line 22:
== LCGT防振系作業部会(2009) ==
=== 第6回 ===
 . 11月12日(木) 15:00-16:30 天文台輪講室
 . [[attachment:LCGT/subgroup/vis/Modeling6.ppt|Model vs. Measurement in TAMA-SAS]]
 . [[attachment:LCGT/subgroup/vis/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]]
== Instruments ==
Line 95: Line 24:
=== 第5回 ===
 . 10月15日(木) 13:00-14:30 天文台大会議室 ([[attachment:LCGT/subgroup/vis/minutes5.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling5.ppt|LCGT-SAS Modeling 5 (Type-B,C)]]
 . [[attachment:LCGT/subgroup/vis/chamber-A.pdf|Design of Type-A chamber]]
=== Suspension types ===
[[KAGRA/Subgroups/VIS/TypeA|Type-A]]
Line 100: Line 27:
=== ブレーンストーミング ===
 . 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 ([[attachment:LCGT/subgroup/vis/minutes-b.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/brest.pdf|メモ]]
[[KAGRA/Subgroups/VIS/TypeB|Type-B]]
Line 104: Line 29:
=== 第4回 ===
 . 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes4.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]]
 . [[attachment:LCGT/subgroup/vis/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]]
 . [[attachment:LCGT/subgroup/vis/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]])
[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]
Line 110: Line 31:
=== 第3回 ===
 . 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes3.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling2.ppt|LCGT-SAS Modeling 2]]
 . [[attachment:LCGT/subgroup/vis/RandD2.pdf|低温懸架のR&Dについて]]
[[KAGRA/Subgroups/VIS/Type-C|Type-C]]
Line 115: Line 33:
=== 第2回 ===
 . 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes2.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]]
 . [[attachment:LCGT/subgroup/vis/RandD.pdf|LCGT-SASのR&Dについて]]
[[KAGRA/Subgroups/VIS/Payload|Payload]]
Line 120: Line 35:
=== 第1回 ===
 . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes1.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]]
 . [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]])
 . [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]]
 . R&Dについて (次回)
[[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]

[[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]]

=== Suspended optics ===

The optics in the KAGRA interferometer are often called their acronyms/abbreviations. Please mind also that we call the vacuum chambers or clean booths in a similar manner.

 * Arm cavity
  * ETMX
  * ETMY
  * ITMX
  * ITMY
 * Beam splitter (BS)
 * Signal recycling cavity
  * SRM
  * SR2
  * SR3
 * Power recycling cavity
  * PRM
  * PR2
  * PR3
 * Input optics
  * IMC
  * IMMT1
  * IMMT2
 * Output optics
  * OMMT1
  * OMMT2
  * OSTM
  * OMC
 * Auxiliary optics
  * TMSX
  * TMSY

=== Mechanics ===

==== Tower ====
 * Pre-isolator
  * Inverted Pendulum (IP)
  * Top GAS Filter (TF<<FootNote(This abbreviation should be avoided because it often refers to rather ''transfer function''.)>>)
 * Standard GAS Filter (SF)
 * Bottom GAS Filter (BF)
 * Magnetic damper

==== Payload ====
 * Cryogenic payload (CRYp): The bottom 4 stages in Type-A suspension, branch recoil-mass chain
  * Platform (PF)
  * Marionette (MN)
  * Intermediate Mass (IM)
  * Test Mass (TM)
 * Room-temperature payload: The bottom 2 stages in Type-B and Type-Bp suspension, parallel recoil-mass chain
  * Intermediate Mass (IM)
  * Test Mass (TM)

=== Electronics ===

A list of local sensors, actuators, and motors equipped by the suspension systems.

 * '''LVDT''' - Linear Variable Differential Transducer/Transformer, displacement sensor
  * [''Derivative''] Bottom-filter LVDT (BF LVDT)
 * '''Geophone''' - inertial velocity sensor
 * '''Accelerometer''' -
 * '''OSEM''' - Optical Sensor and Electromagnet
 * '''Optical Lever'''
 * '''Fishing rod'''
 * Picomotor
 *
Line 128: Line 105:
== Archive == == Integration with digital system ==
Line 130: Line 107:
=== TAMA SAS ===
 . [[attachment:LCGT/subgroup/vis/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]]
 . [[attachment:tama_sas.pdf|Drawings of TAMA SAS]]
 . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]]
 . ''See also:''
Line 135: Line 109:
=== TAMA Double Pendulum ===
 . [[LCGT/subgroup/vis/tama_double|Item list to be improved]]
All the sensor readouts, actuation signals, and motor operation commands are governed with KAGRA digital signal processing system provided by DGS subsystem.
Line 138: Line 111:
=== Seismic spectrum in Kamioka mine ===
 . [[attachment:LCGT/subgroup/ifo/SPI/HeatLink/0702seis_Araya.zip|In loud day]] (This data should be used as nominal ground motion in Kamioka)
 . [[attachment:CLIO/NoiseBudgets/seismic/cryo_seismic.txt|In cryostat]]
----
== Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]
Line 142: Line 116:
=== LCGT-SAS model ===
 . Transfer function X0~X7/Xg --([[attachment:LCGT/subgroup/vis/model_trf.txt|(old)]])--
 . Modeling M-file --([[attachment:LCGT/subgroup/vis/model_mfile.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_mfile2.zip|(2009/8/17)]]
 . Spectrum of displacement --([[attachment:LCGT/subgroup/vis/model_disp.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_disp2.zip|(2009/8/17)]]
 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Real Time Model Development ==
 . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]]
----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]
Line 147: Line 124:
=== Finite Element Analysis ===
 . [[LCGT/subgroup/vis/FEM|FEM Page]]
----
== VIS Introductioon ==
 . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]]
Line 150: Line 128:
=== Rigid-Body Models ===
 . [[LCGT/subgroup/vis/Simulation|Simulation Page]]

----
== VIS Commissioning ==
 . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]]



----
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]

----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.

[[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]

== Subgroup ==

=== Members ===

 * Chief: R. Takahashi
 * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)

=== Communication info ===

 * Mailing list: [kagra-seis]

<<Navigation(children)>>

VIS

Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer.

Space for VIS-internal use

Quick announcement

  • VIS meeting: From 14:00 (JST) on every Friday - Meeting Page


VIS Upgrades

Upgrade Page


Instruments

Suspension types

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs

Suspended optics

The optics in the KAGRA interferometer are often called their acronyms/abbreviations. Please mind also that we call the vacuum chambers or clean booths in a similar manner.

  • Arm cavity
    • ETMX
    • ETMY
    • ITMX
    • ITMY
  • Beam splitter (BS)
  • Signal recycling cavity
    • SRM
    • SR2
    • SR3
  • Power recycling cavity
    • PRM
    • PR2
    • PR3
  • Input optics
    • IMC
    • IMMT1
    • IMMT2
  • Output optics
    • OMMT1
    • OMMT2
    • OSTM
    • OMC
  • Auxiliary optics
    • TMSX
    • TMSY

Mechanics

Tower

  • Pre-isolator
    • Inverted Pendulum (IP)
    • Top GAS Filter (TF1)

  • Standard GAS Filter (SF)
  • Bottom GAS Filter (BF)
  • Magnetic damper

Payload

  • Cryogenic payload (CRYp): The bottom 4 stages in Type-A suspension, branch recoil-mass chain
    • Platform (PF)
    • Marionette (MN)
    • Intermediate Mass (IM)
    • Test Mass (TM)
  • Room-temperature payload: The bottom 2 stages in Type-B and Type-Bp suspension, parallel recoil-mass chain
    • Intermediate Mass (IM)
    • Test Mass (TM)

Electronics

A list of local sensors, actuators, and motors equipped by the suspension systems.

  • LVDT - Linear Variable Differential Transducer/Transformer, displacement sensor

    • [Derivative] Bottom-filter LVDT (BF LVDT)

  • Geophone - inertial velocity sensor

  • Accelerometer -

  • OSEM - Optical Sensor and Electromagnet

  • Optical Lever

  • Fishing rod

  • Picomotor


Integration with digital system

  • See also:

All the sensor readouts, actuation signals, and motor operation commands are governed with KAGRA digital signal processing system provided by DGS subsystem.


Installation


Real Time Model Development


Operation


VIS Introductioon


VIS Commissioning


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

Subgroup

Members

  • Chief: R. Takahashi
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)

Communication info

  • Mailing list: [kagra-seis]

  1. This abbreviation should be avoided because it often refers to rather transfer function. (1)