808
Comment:
|
3292
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
|| '''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || | ## page was renamed from LCGT/subgroup/vis = VIS = '''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer. |
Line 5: | Line 9: |
== 防振系 == | == Space for VIS-internal use == |
Line 7: | Line 11: |
リーダー: 高橋竜太郎 (NAOJ) <<BR>> | === Quick announcement === |
Line 9: | Line 13: |
サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR) | === Frequently used links === * '''VIS meeting''': From 14:00 (JST) on every Friday - [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] ---- == VIS Upgrades == [[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]] ---- == Instruments == === Suspension types === [[KAGRA/Subgroups/VIS/TypeA|Type-A]] [[KAGRA/Subgroups/VIS/TypeB|Type-B]] [[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] [[KAGRA/Subgroups/VIS/Type-C|Type-C]] [[KAGRA/Subgroups/VIS/Payload|Payload]] [[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]] [[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]] === Suspended optics === The optics in the KAGRA interferometer is often called their acronyms/abbreviations. Please mind also that we call the vacuum chambers or clean booths in a similar manner. * Arm cavity * ETMX * ETMY * ITMX * ITMY * Beam splitter (BS) * Signal recycling cavity * SRM * SR2 * SR3 * Power recycling cavity * PRM * PR2 * PR3 * Input optics * IMC * IMMT1 * IMMT2 * Output optics * OMMT1 * OMMT2 * OSTM * OMC * Auxiliary optics * TMSX * TMSY === Mechanics === ==== Tower ==== * Pre-isolator * Inverted Pendulum (IP) * Top GAS Filter (TF<<FootNote(This abbreviation should be avoided because it often refers to rather Transfer Function.)>>) * Standard GAS Filter (SF) * Bottom GAS Filter (BF) * Magnetic damper ==== Payload ==== * Cryogenic payload (CRYp): The bottom 4 stages in Type-A suspension, branch recoil-mass chain * Platform (PF) * Marionette (MN) * Intermediate Mass (IM) * Test Mass (TM) * Room-temperature payload: The bottom 2 stages in Type-B and Type-Bp suspension, parallel recoil-mass chain * Intermediate Mass (IM) * Test Mass (TM) |
Line 12: | Line 91: |
=== 第1回LCGT防振系作業部会 === | ---- == Installation == . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]] . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]] |
Line 14: | Line 96: |
6月3日(水) 17:00-19:00 天文台輪講室 | . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]] ---- == Real Time Model Development == . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]] ---- == Operation == . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]] |
Line 16: | Line 104: |
・[[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]] | ---- == VIS Introductioon == . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]] |
Line 18: | Line 108: |
・[[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] [[attachment:ICDsas.pdf|PDF]] | |
Line 20: | Line 109: |
・[[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]] | ---- == VIS Commissioning == . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]] |
Line 22: | Line 113: |
・R&Dについて | ---- == Archives == . [[KAGRA/Subgroups/VIS/Photos|Photos]] ---- == Old Weekly EVO Meeting == . This meeting is suspended. [[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]] == Members == * Chief: R. Takahashi * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) <<Navigation(children)>> |
VIS
Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer.
Contents
Space for VIS-internal use
Quick announcement
Frequently used links
VIS meeting: From 14:00 (JST) on every Friday - Meeting Page
VIS Upgrades
Instruments
Suspension types
Suspended optics
The optics in the KAGRA interferometer is often called their acronyms/abbreviations. Please mind also that we call the vacuum chambers or clean booths in a similar manner.
- Arm cavity
- ETMX
- ETMY
- ITMX
- ITMY
- Beam splitter (BS)
- Signal recycling cavity
- SRM
- SR2
- SR3
- Power recycling cavity
- PRM
- PR2
- PR3
- Input optics
- IMC
- IMMT1
- IMMT2
- Output optics
- OMMT1
- OMMT2
- OSTM
- OMC
- Auxiliary optics
- TMSX
- TMSY
Mechanics
Tower
- Pre-isolator
- Inverted Pendulum (IP)
Top GAS Filter (TF1)
- Standard GAS Filter (SF)
- Bottom GAS Filter (BF)
- Magnetic damper
Payload
- Cryogenic payload (CRYp): The bottom 4 stages in Type-A suspension, branch recoil-mass chain
- Platform (PF)
- Marionette (MN)
- Intermediate Mass (IM)
- Test Mass (TM)
- Room-temperature payload: The bottom 2 stages in Type-B and Type-Bp suspension, parallel recoil-mass chain
- Intermediate Mass (IM)
- Test Mass (TM)
Installation
Real Time Model Development
Operation
VIS Introductioon
VIS Commissioning
Archives
Old Weekly EVO Meeting
- This meeting is suspended.
Members
- Chief: R. Takahashi
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
This abbreviation should be avoided because it often refers to rather Transfer Function. (1)