|| '''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || ## page was renamed from LCGT/subgroup/vis

= VIS =
----
'''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer.
Line 5: Line 9:
== 防振系 == == Space for VIS-internal use ==
Line 7: Line 11:
 常温防振+ヒートリンク+低温懸架 === Quick announcement ===
Line 9: Line 13:
 リーダー: 高橋竜太郎 (NAOJ) <<BR>> === Frequently used links ===
 * '''VIS meeting''': From 14:00 (JST) on every Friday - [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]
Line 11: Line 16:
 サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR) ----
== VIS Upgrades ==

[[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]]

----
== Instruments ==

=== Suspension types ===
[[KAGRA/Subgroups/VIS/TypeA|Type-A]]

[[KAGRA/Subgroups/VIS/TypeB|Type-B]]

[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]

[[KAGRA/Subgroups/VIS/Type-C|Type-C]]

[[KAGRA/Subgroups/VIS/Payload|Payload]]

[[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]

[[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]]

=== Suspended optics ===

The optics in the KAGRA interferometer are often called their acronyms/abbreviations. Please mind also that we call the vacuum chambers or clean booths in a similar manner.

 * Arm cavity
  * ETMX
  * ETMY
  * ITMX
  * ITMY
 * Beam splitter (BS)
 * Signal recycling cavity
  * SRM
  * SR2
  * SR3
 * Power recycling cavity
  * PRM
  * PR2
  * PR3
 * Input optics
  * IMC
  * IMMT1
  * IMMT2
 * Output optics
  * OMMT1
  * OMMT2
  * OSTM
  * OMC
 * Auxiliary optics
  * TMSX
  * TMSY

=== Mechanics ===

==== Tower ====
 * Pre-isolator
  * Inverted Pendulum (IP)
  * Top GAS Filter (TF<<FootNote(This abbreviation should be avoided because it often refers to rather Transfer Function.)>>)
 * Standard GAS Filter (SF)
 * Bottom GAS Filter (BF)
 * Magnetic damper

==== Payload ====
 * Cryogenic payload (CRYp): The bottom 4 stages in Type-A suspension, branch recoil-mass chain
  * Platform (PF)
  * Marionette (MN)
  * Intermediate Mass (IM)
  * Test Mass (TM)
 * Room-temperature payload: The bottom 2 stages in Type-B and Type-Bp suspension, parallel recoil-mass chain
  * Intermediate Mass (IM)
  * Test Mass (TM)

=== Electronics ===

A list of local sensors, actuators, and motors equipped by the suspension systems.

 * '''LVDT''' - Linear Variable Differential Transducer/Transformer, displacement sensor
  * [''Derivative''] Bottom-filter LVDT (BF LVDT)
 * '''Geophone''' - inertial velocity sensor
 * '''Accelerometer''' -
 * '''OSEM''' - Optical Sensor and Electromagnet
 * '''Optical Lever'''
 * '''Fishing rod'''
 * Picomotor
 *

----
== Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]

 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Real Time Model Development ==
 . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]]
----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]

----
== VIS Introductioon ==
 . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]]
Line 14: Line 122:
=== TAMA SAS の問題点 ===
 . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]]
----
== VIS Commissioning ==
 . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]]
Line 17: Line 126:
=== TAMA Double Pendulum の問題点 ===
 . [[LCGT/subgroup/vis/tama_double|Item list to be improved]]
Line 20: Line 127:
=== 第1回LCGT防振系作業部会 ===
Line 22: Line 128:
 6月3日(水) 17:00-19:00 天文台輪講室 ----
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]
Line 24: Line 132:
 [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]] ----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.
Line 26: Line 136:
 [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]]) [[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]
Line 28: Line 138:
 [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]] == Subgroup ==
Line 30: Line 140:
 R&Dについて === Members ===

 * Chief: R. Takahashi
 * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)

=== Communication info ===

 * Mailing list: [kagra-seis]

<<Navigation(children)>>

VIS


Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer.

Space for VIS-internal use

Quick announcement

  • VIS meeting: From 14:00 (JST) on every Friday - Meeting Page


VIS Upgrades

Upgrade Page


Instruments

Suspension types

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs

Suspended optics

The optics in the KAGRA interferometer are often called their acronyms/abbreviations. Please mind also that we call the vacuum chambers or clean booths in a similar manner.

  • Arm cavity
    • ETMX
    • ETMY
    • ITMX
    • ITMY
  • Beam splitter (BS)
  • Signal recycling cavity
    • SRM
    • SR2
    • SR3
  • Power recycling cavity
    • PRM
    • PR2
    • PR3
  • Input optics
    • IMC
    • IMMT1
    • IMMT2
  • Output optics
    • OMMT1
    • OMMT2
    • OSTM
    • OMC
  • Auxiliary optics
    • TMSX
    • TMSY

Mechanics

Tower

  • Pre-isolator
    • Inverted Pendulum (IP)
    • Top GAS Filter (TF1)

  • Standard GAS Filter (SF)
  • Bottom GAS Filter (BF)
  • Magnetic damper

Payload

  • Cryogenic payload (CRYp): The bottom 4 stages in Type-A suspension, branch recoil-mass chain
    • Platform (PF)
    • Marionette (MN)
    • Intermediate Mass (IM)
    • Test Mass (TM)
  • Room-temperature payload: The bottom 2 stages in Type-B and Type-Bp suspension, parallel recoil-mass chain
    • Intermediate Mass (IM)
    • Test Mass (TM)

Electronics

A list of local sensors, actuators, and motors equipped by the suspension systems.

  • LVDT - Linear Variable Differential Transducer/Transformer, displacement sensor

    • [Derivative] Bottom-filter LVDT (BF LVDT)

  • Geophone - inertial velocity sensor

  • Accelerometer -

  • OSEM - Optical Sensor and Electromagnet

  • Optical Lever

  • Fishing rod

  • Picomotor


Installation


Real Time Model Development


Operation


VIS Introductioon


VIS Commissioning


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

Subgroup

Members

  • Chief: R. Takahashi
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)

Communication info

  • Mailing list: [kagra-seis]

  1. This abbreviation should be avoided because it often refers to rather Transfer Function. (1)

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)