1280
Comment:
|
4271
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
|| '''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || | ## page was renamed from LCGT/subgroup/vis = VIS = '''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer. * '''VIS meeting''': From 14:00 (JST) on every Friday - [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] |
Line 5: | Line 11: |
== 防振系 == | |
Line 7: | Line 12: |
常温防振+ヒートリンク+低温懸架 | ---- == VIS Upgrades == |
Line 9: | Line 15: |
リーダー: 高橋竜太郎 (NAOJ) <<BR>> | [[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]] |
Line 11: | Line 17: |
サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR) | ---- == Instruments == === Suspension types === [[KAGRA/Subgroups/VIS/TypeA|Type-A]] [[KAGRA/Subgroups/VIS/TypeB|Type-B]] [[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] [[KAGRA/Subgroups/VIS/Type-C|Type-C]] [[KAGRA/Subgroups/VIS/Payload|Payload]] [[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]] [[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]] === Suspended optics === The optics in the KAGRA interferometer are often called their acronyms/abbreviations<<FootNote(Please mind also that we call the vacuum chambers or clean booths in a similar manner.)>> listed below. The linked pages from the optics' names show the specification of each component of the suspension systems. * Arm cavity * ETMX * ETMY * ITMX * ITMY * Beam splitter (BS) * Signal recycling cavity * SRM * SR2 * SR3 * Power recycling cavity * PRM * PR2 * PR3 * Input optics * IMC * IMMT1 * IMMT2 * Output optics * OMMT1 * OMMT2 * OSTM * OMC * Auxiliary optics * TMSX * TMSY === Mechanics === ==== Tower ==== * Pre-isolator * Inverted Pendulum (IP) * Top GAS Filter (TF<<FootNote(This abbreviation should be avoided because it often refers to rather ''transfer function''.)>>) * Standard GAS Filter (SF) * Bottom GAS Filter (BF) * Magnetic damper ==== Payload ==== * Cryogenic payload (CRYp): The bottom 4 stages in Type-A suspension, branch recoil-mass chain * Platform (PF) * Marionette (MN) * Intermediate Mass (IM) * Test Mass (TM) * Room-temperature payload: The bottom 2 stages in Type-B and Type-Bp suspension, parallel recoil-mass chain * Intermediate Mass (IM) * Test Mass (TM) === Electronics === A list of local sensors, actuators, and motors equipped by the suspension systems. * '''LVDT''' - Linear Variable Differential Transducer/Transformer, displacement sensor * [''Derivative''] Bottom-filter LVDT (BF LVDT) * '''Geophone''' - inertial velocity sensor * '''Accelerometer''' - * '''OSEM''' - Optical Sensor and Electromagnet * '''Optical Lever''' * '''Fishing rod''' * Picomotor * ---- == Integration with digital system == . ''See also:'' [[KAGRA/Subgroups/DGS|DGS subgroup]] All the sensor readouts, actuation signals, and motor operation commands are governed with the KAGRA digital signal processing system provided by DGS subgroup. === Real-time front-end model === . ''See also:'' [[KAGRA/Subgroups/VIS|Real-time model development]] |
Line 14: | Line 112: |
=== 第2回LCGT防振系作業部会 === | |
Line 16: | Line 113: |
7月16日(水) 15:00-16:30 天文台輪講室 | === === |
Line 18: | Line 115: |
[[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]] | |
Line 20: | Line 116: |
[[attachment:LCGT/subgroup/vis/Modeling1.ppt|R&Dについて]] | ---- == Apps == |
Line 22: | Line 119: |
=== 第1回LCGT防振系作業部会 === | |
Line 24: | Line 120: |
6月3日(水) 17:00-19:00 天文台輪講室 | ---- == Installation == . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]] . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]] |
Line 26: | Line 125: |
[[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]] | . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]] ---- == Real Time Model Development == . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]] ---- == Operation == . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]] |
Line 28: | Line 133: |
[[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]]) | ---- == VIS Introductioon == . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]] |
Line 30: | Line 137: |
[[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]] | |
Line 32: | Line 138: |
R&Dについて === TAMA SAS の問題点 === . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]] |
---- == VIS Commissioning == . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]] |
Line 36: | Line 142: |
=== TAMA Double Pendulum の問題点 === . [[LCGT/subgroup/vis/tama_double|Item list to be improved]] |
---- == Archives == . [[KAGRA/Subgroups/VIS/Photos|Photos]] ---- == Old Weekly EVO Meeting == . This meeting is suspended. [[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]] == Subgroup == === Members === * Chief: R. Takahashi * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) === Communication info === * Mailing list: [kagra-seis] <<Navigation(children)>> |
VIS
Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer.
VIS meeting: From 14:00 (JST) on every Friday - Meeting Page
Contents
VIS Upgrades
Instruments
Suspension types
Suspended optics
The optics in the KAGRA interferometer are often called their acronyms/abbreviations1 listed below. The linked pages from the optics' names show the specification of each component of the suspension systems.
- Arm cavity
- ETMX
- ETMY
- ITMX
- ITMY
- Beam splitter (BS)
- Signal recycling cavity
- SRM
- SR2
- SR3
- Power recycling cavity
- PRM
- PR2
- PR3
- Input optics
- IMC
- IMMT1
- IMMT2
- Output optics
- OMMT1
- OMMT2
- OSTM
- OMC
- Auxiliary optics
- TMSX
- TMSY
Mechanics
Tower
- Pre-isolator
- Inverted Pendulum (IP)
Top GAS Filter (TF2)
- Standard GAS Filter (SF)
- Bottom GAS Filter (BF)
- Magnetic damper
Payload
- Cryogenic payload (CRYp): The bottom 4 stages in Type-A suspension, branch recoil-mass chain
- Platform (PF)
- Marionette (MN)
- Intermediate Mass (IM)
- Test Mass (TM)
- Room-temperature payload: The bottom 2 stages in Type-B and Type-Bp suspension, parallel recoil-mass chain
- Intermediate Mass (IM)
- Test Mass (TM)
Electronics
A list of local sensors, actuators, and motors equipped by the suspension systems.
LVDT - Linear Variable Differential Transducer/Transformer, displacement sensor
[Derivative] Bottom-filter LVDT (BF LVDT)
Geophone - inertial velocity sensor
Accelerometer -
OSEM - Optical Sensor and Electromagnet
Optical Lever
Fishing rod
- Picomotor
Integration with digital system
See also: DGS subgroup
All the sensor readouts, actuation signals, and motor operation commands are governed with the KAGRA digital signal processing system provided by DGS subgroup.
Real-time front-end model
See also: Real-time model development
Apps
Installation
Real Time Model Development
Operation
VIS Introductioon
VIS Commissioning
Archives
Old Weekly EVO Meeting
- This meeting is suspended.
Subgroup
Members
- Chief: R. Takahashi
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
Communication info
- Mailing list: [kagra-seis]