2246
Comment:
|
2437
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
||'''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || | ## page was renamed from LCGT/subgroup/vis |
Line 3: | Line 3: |
= VIS = '''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer. |
|
Line 6: | Line 9: |
== 防振系 == . 常温防振+ヒートリンク+低温懸架 . リーダー: 高橋竜太郎 (NAOJ) . サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR) |
== Space for VIS-internal use == |
Line 11: | Line 11: |
=== 第3回LCGT防振系作業部会 === . 8月6日(木) 15:00-16:30 天文台輪講室 [[attachment:LCGT/subgroup/vis/Modeling2.ppt|LCGT-SAS Modeling 2]] . [[attachment:LCGT/subgroup/vis/RandD2.pdf|低温懸架のR&Dについて]] |
=== Quick announcement === |
Line 16: | Line 13: |
=== 第2回LCGT防振系作業部会 === . 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes2.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]] . [[attachment:LCGT/subgroup/vis/RandD.pdf|LCGT-SASのR&Dについて]] |
=== Frequently used links === * '''VIS meeting''': From 14:00 (JST) on every Friday - [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] |
Line 21: | Line 16: |
=== 第1回LCGT防振系作業部会 === . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes1.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]] . [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]]) . [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]] . R&Dについて (次回) |
---- == VIS Upgrades == |
Line 28: | Line 19: |
=== TAMA SAS の問題点 === . [[attachment:tama_sas.pdf|Drawings of TAMA SAS]] . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]] |
[[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]] |
Line 32: | Line 21: |
=== TAMA Double Pendulum の問題点 === . [[LCGT/subgroup/vis/tama_double|Item list to be improved]] |
---- == Suspension types == [[KAGRA/Subgroups/VIS/TypeA|Type-A]] |
Line 35: | Line 25: |
=== Seismic spectrum in Kamioka mine === . [[attachment:LCGT/subgroup/ifo/SPI/HeatLink/0702seis_Araya.zip|In loud day]] (This data should be used as nominal ground motion in Kamioka) . [[attachment:CLIO/NoiseBudgets/seismic/cryo_seismic.txt|In cryostat]] |
[[KAGRA/Subgroups/VIS/TypeB|Type-B]] |
Line 39: | Line 27: |
=== The LCGT-SAS model === . [[attachment:LCGT/subgroup/vis/model_trf.txt|Transfer function X0~X7/Xg (old)]] . [[attachment:LCGT/subgroup/vis/model_mfile.zip|Modeling M-file (2009/8/15)]] . [[attachment:LCGT/subgroup/vis/model_disp.zip|Spectrum of displacement (2009/8/15)]] |
[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] [[KAGRA/Subgroups/VIS/Type-C|Type-C]] [[KAGRA/Subgroups/VIS/Payload|Payload]] [[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]] [[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]] == Suspended optics == * Arm cavity * ETMX * ETMY * ITMX * ITMY * Beam splitter (BS) * Signal recycling cavity * SRM * SR2 * SR3 * Power recycling cavity * PRM * PR2 * PR3 * Input optics * IMC * IMMT1 * IMMT2 * Output optics * OMMT1 * OMMT2 * OSTM * OMC * Auxiliary optics * TMSX * TMSY ---- == Installation == . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]] . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]] . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]] ---- == Real Time Model Development == . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]] ---- == Operation == . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]] ---- == VIS Introductioon == . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]] ---- == VIS Commissioning == . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]] ---- == Archives == . [[KAGRA/Subgroups/VIS/Photos|Photos]] ---- == Old Weekly EVO Meeting == . This meeting is suspended. [[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]] == Members == * Chief: R. Takahashi * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) <<Navigation(children)>> |
VIS
Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer.
Contents
Space for VIS-internal use
Quick announcement
Frequently used links
VIS meeting: From 14:00 (JST) on every Friday - Meeting Page
VIS Upgrades
Suspension types
Suspended optics
- Arm cavity
- ETMX
- ETMY
- ITMX
- ITMY
- Beam splitter (BS)
- Signal recycling cavity
- SRM
- SR2
- SR3
- Power recycling cavity
- PRM
- PR2
- PR3
- Input optics
- IMC
- IMMT1
- IMMT2
- Output optics
- OMMT1
- OMMT2
- OSTM
- OMC
- Auxiliary optics
- TMSX
- TMSY
Installation
Real Time Model Development
Operation
VIS Introductioon
VIS Commissioning
Archives
Old Weekly EVO Meeting
- This meeting is suspended.
Members
- Chief: R. Takahashi
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)