||'''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || ## page was renamed from LCGT/subgroup/vis
Line 3: Line 3:
= VIS =

'''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer.
Line 6: Line 9:
== 防振系 ==
 . 常温防振+ヒートリンク+低温懸架
 . リーダー: 高橋竜太郎 (NAOJ)
== Space for VIS-internal use ==
Line 10: Line 11:
=== 第6回LCGT防振系作業部会 ===
 . 11月12日(木) 15:00-16:30 天文台輪講室
 . [[attachment:LCGT/subgroup/vis/Modeling6.ppt|Model vs. Measurement in TAMA-SAS]]
 . [[attachment:LCGT/subgroup/vis/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]]
=== Quick announcement ===
Line 15: Line 13:
=== 第5回LCGT防振系作業部会 ===
 . --(10月8日(木) 15:00-16:30 天文台輪講室)--
 . 10月15日(木) 13:00-14:30 天文台大会議室 ([[attachment:LCGT/subgroup/vis/minutes5.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling5.ppt|LCGT-SAS Modeling 5 (Type-B,C)]]
 . [[attachment:LCGT/subgroup/vis/chamber-A.pdf|Design of Type-A chamber]]
=== Frequently used links ===
 * '''VIS meeting''': From 14:00 (JST) on every Friday - [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]
Line 21: Line 16:
=== LCGT防振系作業部会ブレーンストーミング ===
 . 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 ([[attachment:LCGT/subgroup/vis/minutes-b.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/brest.pdf|メモ]]
----
== VIS Upgrades ==
Line 25: Line 19:
=== 第4回LCGT防振系作業部会 ===
 . 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes4.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]]
 . [[attachment:LCGT/subgroup/vis/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]]
 . [[attachment:LCGT/subgroup/vis/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]])
[[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]]
Line 31: Line 21:
=== 第3回LCGT防振系作業部会 ===
 . 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes3.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling2.ppt|LCGT-SAS Modeling 2]]
 . [[attachment:LCGT/subgroup/vis/RandD2.pdf|低温懸架のR&Dについて]]
----
== Instruments ==
Line 36: Line 24:
=== 第2回LCGT防振系作業部会 ===
 . 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes2.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]]
 . [[attachment:LCGT/subgroup/vis/RandD.pdf|LCGT-SASのR&Dについて]]
=== Suspension types ===
[[KAGRA/Subgroups/VIS/TypeA|Type-A]]
Line 41: Line 27:
=== 第1回LCGT防振系作業部会 ===
 . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes1.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]]
 . [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]])
 . [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]]
 . R&Dについて (次回)
[[KAGRA/Subgroups/VIS/TypeB|Type-B]]
Line 48: Line 29:
=== TAMA SAS の問題点 ===
 . [[attachment:LCGT/subgroup/vis/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]]
 . [[attachment:tama_sas.pdf|Drawings of TAMA SAS]]
 . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]]
[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]
Line 53: Line 31:
=== TAMA Double Pendulum の問題点 ===
 . [[LCGT/subgroup/vis/tama_double|Item list to be improved]]
[[KAGRA/Subgroups/VIS/Type-C|Type-C]]
Line 56: Line 33:
=== Seismic spectrum in Kamioka mine ===
 . [[attachment:LCGT/subgroup/ifo/SPI/HeatLink/0702seis_Araya.zip|In loud day]] (This data should be used as nominal ground motion in Kamioka)
 . [[attachment:CLIO/NoiseBudgets/seismic/cryo_seismic.txt|In cryostat]]
[[KAGRA/Subgroups/VIS/Payload|Payload]]
Line 60: Line 35:
=== LCGT-SAS model ===
 . Transfer function X0~X7/Xg --([[attachment:LCGT/subgroup/vis/model_trf.txt|(old)]])--
 . Modeling M-file --([[attachment:LCGT/subgroup/vis/model_mfile.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_mfile2.zip|(2009/8/17)]]
 . Spectrum of displacement --([[attachment:LCGT/subgroup/vis/model_disp.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_disp2.zip|(2009/8/17)]]
[[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]

[[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]]

=== Suspended optics ===

 * Arm cavity
  * ETMX
  * ETMY
  * ITMX
  * ITMY
 * Beam splitter (BS)
 * Signal recycling cavity
  * SRM
  * SR2
  * SR3
 * Power recycling cavity
  * PRM
  * PR2
  * PR3
 * Input optics
  * IMC
  * IMMT1
  * IMMT2
 * Output optics
  * OMMT1
  * OMMT2
  * OSTM
  * OMC
 * Auxiliary optics
  * TMSX
  * TMSY

----
== Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]

 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Real Time Model Development ==
 . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]]
----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]

----
== VIS Introductioon ==
 . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]]


----
== VIS Commissioning ==
 . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]]



----
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]

----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.

[[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]

== Members ==

 * Chief: R. Takahashi
 * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


<<Navigation(children)>>

VIS

Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer.

Space for VIS-internal use

Quick announcement

  • VIS meeting: From 14:00 (JST) on every Friday - Meeting Page


VIS Upgrades

Upgrade Page


Instruments

Suspension types

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs

Suspended optics

  • Arm cavity
    • ETMX
    • ETMY
    • ITMX
    • ITMY
  • Beam splitter (BS)
  • Signal recycling cavity
    • SRM
    • SR2
    • SR3
  • Power recycling cavity
    • PRM
    • PR2
    • PR3
  • Input optics
    • IMC
    • IMMT1
    • IMMT2
  • Output optics
    • OMMT1
    • OMMT2
    • OSTM
    • OMC
  • Auxiliary optics
    • TMSX
    • TMSY


Installation


Real Time Model Development


Operation


VIS Introductioon


VIS Commissioning


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

Members

  • Chief: R. Takahashi
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)