Differences between revisions 1 and 188 (spanning 187 versions)
Revision 1 as of 2009-06-01 17:58:27
Size: 196
Comment:
Revision 188 as of 2020-02-28 10:50:35
Size: 1981
Editor: KokiOkutomi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
'''防振''' ## page was renamed from LCGT/subgroup/vis
Line 3: Line 3:
リーダー: 高橋竜太郎 (NAOJ) = VIS =
Line 5: Line 5:
サブリーダー:内山隆 (ICRR) '''V'''ibration '''I'''solation '''S'''ystem is the infrastructure for the main optics in the KAGRA interferometer.
Line 7: Line 7:
サブリーダー:三代木伸二 (ICRR) <<TableOfContents(3)>>
Line 9: Line 9:
*[[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] == Vibration Isolation ==
 . Chief: R. Takahashi (NAOJ)
 . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)

----
== VIS Meeting ==
 . Every Friday, from 13:30 (JST)
 . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]

----
== VIS Upgrades ==

[[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]]

----
== Design ==
[[KAGRA/Subgroups/VIS/TypeA|Type-A]]

[[KAGRA/Subgroups/VIS/TypeB|Type-B]]

[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]

[[KAGRA/Subgroups/VIS/Type-C|Type-C]]

[[KAGRA/Subgroups/VIS/Payload|Payload]]

[[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]

[[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]]

----
== Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]

 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Real Time Model Development ==
 . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]]
----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]

----
== VIS Introductioon ==
 . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]]


----
== VIS Commissioning ==
 . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]]



----
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]

----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.

[[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]

<<Navigation(children)>>

VIS

Vibration Isolation System is the infrastructure for the main optics in the KAGRA interferometer.

Vibration Isolation

  • Chief: R. Takahashi (NAOJ)
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


VIS Meeting


VIS Upgrades

Upgrade Page


Design

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs


Installation


Real Time Model Development


Operation


VIS Introductioon


VIS Commissioning


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)