= VIS = '''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer. |
|
Line 4: | Line 9: |
== Vibration Isolation == . Chief: R. Takahashi (NAOJ) . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) |
== Space for VIS-internal Use == === Quick Announcement === === Frequently Used Links === * VIS meeting: From 14:00 (JST) on every Friday [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] |
Line 10: | Line 17: |
== VIS Meeting == . Every Friday, from 13:30 (JST) . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] |
== VIS Upgrades == [[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]] |
Line 26: | Line 33: |
iKAGRA TM | [[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]] [[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]] |
Line 35: | Line 44: |
== Real Time Model Development == . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]] ---- |
|
Line 37: | Line 49: |
---- == VIS Introductioon == . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]] ---- == VIS Commissioning == . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]] ---- == Archives == . [[KAGRA/Subgroups/VIS/Photos|Photos]] |
|
Line 43: | Line 70: |
== Members == * Chief: R. Takahashi * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) <<Navigation(children)>> |
VIS
Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer.
Contents
Space for VIS-internal Use
Quick Announcement
Frequently Used Links
VIS meeting: From 14:00 (JST) on every Friday Meeting Page
VIS Upgrades
Design
Installation
Real Time Model Development
Operation
VIS Introductioon
VIS Commissioning
Archives
Old Weekly EVO Meeting
- This meeting is suspended.
Members
- Chief: R. Takahashi
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)