1408
Comment:
|
1975
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
= VIS = '''V'''ibration '''I'''solation '''S'''ystem is the infrastructure for the optics in the KAGRA interferometer. |
|
Line 6: | Line 11: |
. Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ), | . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ), |
Line 13: | Line 18: |
---- == VIS Upgrades == [[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]] |
|
Line 37: | Line 47: |
== Real Time Model Development == . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]] ---- |
|
Line 39: | Line 52: |
---- == VIS Introductioon == . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]] ---- == VIS Commissioning == . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]] |
|
Line 49: | Line 73: |
<<Navigation(children)>> |
VIS
Vibration Isolation System is the infrastructure for the optics in the KAGRA interferometer.
Contents
Vibration Isolation
- Chief: R. Takahashi (NAOJ)
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
VIS Meeting
- Every Friday, from 13:30 (JST)
VIS Upgrades
Design
Installation
Real Time Model Development
Operation
VIS Introductioon
VIS Commissioning
Archives
Old Weekly EVO Meeting
- This meeting is suspended.