Differences between revisions 187 and 188
Revision 187 as of 2020-02-28 10:49:25
Size: 1975
Editor: KokiOkutomi
Comment:
Revision 188 as of 2020-02-28 10:50:35
Size: 1981
Editor: KokiOkutomi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
'''V'''ibration '''I'''solation '''S'''ystem is the infrastructure for the optics in the KAGRA interferometer. '''V'''ibration '''I'''solation '''S'''ystem is the infrastructure for the main optics in the KAGRA interferometer. 

VIS

Vibration Isolation System is the infrastructure for the main optics in the KAGRA interferometer.

Vibration Isolation

  • Chief: R. Takahashi (NAOJ)
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


VIS Meeting


VIS Upgrades

Upgrade Page


Design

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs


Installation


Real Time Model Development


Operation


VIS Introductioon


VIS Commissioning


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)