Differences between revisions 190 and 191
Revision 190 as of 2020-02-28 11:40:58
Size: 2010
Editor: KokiOkutomi
Comment:
Revision 191 as of 2020-02-28 11:41:59
Size: 2056
Editor: KokiOkutomi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
 . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]  * VIS meeting: From 14:00 (JST) on every Friday [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]

VIS

Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer.

Space for VIS-internal Use

Quick Announcement


VIS Upgrades

Upgrade Page


Design

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs


Installation


Real Time Model Development


Operation


VIS Introductioon


VIS Commissioning


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

Members

  • Chief: R. Takahashi
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)