Size: 432
Comment:
|
Size: 3373
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
'''防振''' | ## page was renamed from LCGT/subgroup/vis |
Line 3: | Line 3: |
リーダー: 高橋竜太郎 (NAOJ) | = VIS = |
Line 5: | Line 5: |
サブリーダー:内山隆 (ICRR)、三代木伸二 (ICRR) | '''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer. <<TableOfContents(3)>> == Space for VIS-internal use == === Quick announcement === === Frequently used links === * '''VIS meeting''': From 14:00 (JST) on every Friday - [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] ---- == VIS Upgrades == [[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]] ---- == Instruments == === Suspension types === [[KAGRA/Subgroups/VIS/TypeA|Type-A]] [[KAGRA/Subgroups/VIS/TypeB|Type-B]] [[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] [[KAGRA/Subgroups/VIS/Type-C|Type-C]] [[KAGRA/Subgroups/VIS/Payload|Payload]] [[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]] [[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]] === Suspended optics === The optics in the KAGRA interferometer is often called their acronyms/abbreviations. Please mind also that we call the vacuum chambers or clean booths in a similar manner. * Arm cavity * ETMX * ETMY * ITMX * ITMY * Beam splitter (BS) * Signal recycling cavity * SRM * SR2 * SR3 * Power recycling cavity * PRM * PR2 * PR3 * Input optics * IMC * IMMT1 * IMMT2 * Output optics * OMMT1 * OMMT2 * OSTM * OMC * Auxiliary optics * TMSX * TMSY === Mechanics === ==== Tower ==== * Pre-isolator * Inverted Pendulum (IP) * Top GAS Filter (TF<<FootNote(This abbreviation should be avoided because it often refers to rather Transfer Function.)>>) * Standard GAS Filter (SF) * Bottom GAS Filter (BF) * Magnetic damper ==== Payload ==== * Cryogenic payload (CRYp): The bottom 4 stages in Type-A suspension, branch recoil-mass chain * Platform (PF) * Marionette (MN) * Intermediate Mass (IM) * Test Mass (TM) * Room-temperature payload: The bottom 2 stages in Type-B and Type-Bp suspension, parallel recoil-mass chain * Intermediate Mass (IM) * Test Mass (TM) |
Line 8: | Line 91: |
''第1回LCGT防振系作業部会'' | ---- == Installation == . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]] . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]] |
Line 10: | Line 96: |
6月3日(水) 17:00-19:00 天文台輪講室 | . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]] ---- == Real Time Model Development == . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]] ---- == Operation == . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]] |
Line 12: | Line 104: |
・[[attachment:LCGT/subgroup/vis/agenda1.doc|作業班、スケジュール]] | ---- == VIS Introductioon == . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]] |
Line 14: | Line 108: |
・[[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] | |
Line 16: | Line 109: |
・[[attachment:LCGT/subgroup/vis/LCGT-SAS2.doc|常温-Cryo接続部]] | ---- == VIS Commissioning == . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]] |
Line 18: | Line 113: |
・R&D | ---- == Archives == . [[KAGRA/Subgroups/VIS/Photos|Photos]] ---- == Old Weekly EVO Meeting == . This meeting is suspended. [[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]] == Subgroup == === Members === * Chief: R. Takahashi * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) === Communication info === * Mailing list: [kagra-seis] <<Navigation(children)>> |
VIS
Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer.
Contents
Space for VIS-internal use
Quick announcement
Frequently used links
VIS meeting: From 14:00 (JST) on every Friday - Meeting Page
VIS Upgrades
Instruments
Suspension types
Suspended optics
The optics in the KAGRA interferometer is often called their acronyms/abbreviations. Please mind also that we call the vacuum chambers or clean booths in a similar manner.
- Arm cavity
- ETMX
- ETMY
- ITMX
- ITMY
- Beam splitter (BS)
- Signal recycling cavity
- SRM
- SR2
- SR3
- Power recycling cavity
- PRM
- PR2
- PR3
- Input optics
- IMC
- IMMT1
- IMMT2
- Output optics
- OMMT1
- OMMT2
- OSTM
- OMC
- Auxiliary optics
- TMSX
- TMSY
Mechanics
Tower
- Pre-isolator
- Inverted Pendulum (IP)
Top GAS Filter (TF1)
- Standard GAS Filter (SF)
- Bottom GAS Filter (BF)
- Magnetic damper
Payload
- Cryogenic payload (CRYp): The bottom 4 stages in Type-A suspension, branch recoil-mass chain
- Platform (PF)
- Marionette (MN)
- Intermediate Mass (IM)
- Test Mass (TM)
- Room-temperature payload: The bottom 2 stages in Type-B and Type-Bp suspension, parallel recoil-mass chain
- Intermediate Mass (IM)
- Test Mass (TM)
Installation
Real Time Model Development
Operation
VIS Introductioon
VIS Commissioning
Archives
Old Weekly EVO Meeting
- This meeting is suspended.
Subgroup
Members
- Chief: R. Takahashi
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
Communication info
- Mailing list: [kagra-seis]
This abbreviation should be avoided because it often refers to rather Transfer Function. (1)